APR1400 Final Safety Evaluations

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the DCD application that Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) submitted for the Advanced Power Reactor 1400 (APR1400):

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
TOC Table of Contents 09/28/18
1 Introduction and General Discussion 09/28/18
2 Site Characteristics 09/28/18
3 Design of Structures, Components, Equipment, and Systems 09/28/18
4 Reactor 09/28/18
5 Reactor Coolant System and Connected Systems 09/28/18
6 Engineered Safety Features 09/28/18
7 Instrumentation and Controls 09/28/18
8 Electric Power 09/28/18
9 Auxiliary Systems 09/28/18
10 Steam and Power Conversion System 09/28/18
11 Radioactive Waste Management 09/28/18
12 Radiation Protection 09/28/18
13 Conduct of Operations 09/28/18
14 Verification Programs 09/28/18
15 Accident and Transient Analyses 09/28/18
16 Technical Specifications 09/28/18
17 Quality Assurance and Reliability Assurance 09/28/18
18 Human Factors Engineering 09/28/18
19 Probabilistic Risk Assessment and Severe Accident Evaluation 09/28/18
Appendix A Chronology 09/28/18
Appendix B References 09/28/18
Appendix C Acronyms 09/28/18
Appendix D Principal Contributors 09/28/18
Appendix E Index of NRC's Requests for Additional Information 09/28/18
Appendix F Report by the Advisory Committee on Reactor Safeguards 09/28/18