By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
The purpose of this pre-application meeting is to discuss the instrumentation and control (I&C) architecture and design basis and the thermal-hydraulic analysis for Terra Innovatum's SOLO microreactor. Please use the following information to participate for each topic.…
The purpose of this meeting is for X-energy to familiarize NRC staff with their approach to incorporating ROST for transporting spent, used, and non-spherical Xe-100 fuel pebbles within the Xe-100’s spent fuel storage system.
To Discuss Potential Limitation in the NRC Staff's Safety Evaluation for Topical Report SSP-14-P01/028 (NRC Project No. 0816), Generic Application of the Studsvik Scandpower Core Management System to Pressurized Water Reactors
The objective of this workshop is to provide a forum for the NRC and the industry to discuss ongoing efforts to improve PRA Realism. This is a continuation of the workshop originally scheduled for September 30-October 1 that was interrupted due to the government shutdown. Topics…
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and Duke Energy Progress, LLC (Duke) is to discuss a proposed license amendment request for Shearon Harris Nuclear Power Plant, Unit 1 (HPN), to modify HNP Technical Specification (TS) 3/4.7.5, “…
The purpose of the meeting is to discuss supplemental information needed for the SNC Fleet License Amendment Request for Changes to Emergency Action Level Schemes to Adopt NEI 99-01 Rev. 7 (L-2025-LLA-0157).
The purpose of this closed meeting is for Constellation Energy Generation, LLC, (CEG) to discuss with the U.S. Nuclear Regulatory Commission (NRC) staff restoration of the Cyber Security Plan for the Christopher M. Crane Clean Energy Center.
The purpose of this partially closed meeting is for GE Vernova to engage with the NRC on the BWRX-300 Expedited Construction and Manufacturing of Certain Structures, Systems, and Components (SSCs) related to SECY-25-0074 Expedited Construction of Certain Structures, Systems, and…
The purpose of this meeting is for the NRC staff and SMR (Holtec) to discuss the recently submitted two Licensing Topical Reports (LTRs) for SMR-300. This discussion is intended to aid the NRC staff in understanding the structure and contents of these LTRs thus enabling a more…
The purpose of this meeting between the U.S. Nuclear Regulatory Commission (NRC) and NextEra Energy Florida Power & Light Company (NextEra FPL) is to discuss a planned exemption and license amendment request to change examination requirements for operator licenses.
For Westinghouse Electric Company (Westinghouse) to present to the U.S. Nuclear Regulatory Commission (NRC) and discuss proprietary information related to the future submittal of Westinghouse Topical Report (TR) WCAP-19027, "High Burnup Extension for Westinghouse Fuel…
The purpose of the meeting is to discuss with Virginia Electric Power Company (the licensee) a proposed license amendment which proposes to change Technical Specification (TS) 3.16 Action B.1.a.3 and extend its Allowed Outage Time from 7 days to 14 days to facilitate the…
To discuss the process for a special nuclear materials license under Title 10 of the Code of Federal Regulations Part 70 (10 CFR Part 70), the process for a source and byproduct materials license under 10 CFR Part 40, and to clarify construction activities allowed under 10 CFR…
On May 23, 2025, Executive Order 14300, “Ordering the Reform of the Nuclear Regulatory Commission,” directed the NRC to address a wide range of activities, including reforming and modernizing the NRC’s regulations and associated guidance documents. By letter dated
July 31…
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Valley Authority (TVA) is to discuss a proposed alternative request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, for use of mechanical…
The purpose of this meeting is for the NRC staff and SMR (Holtec) to discuss the recently submitted SMR-300 Instrumentation and Control Architecture Licensing Topical Report. This discussion would help the NRC staff conduct a more efficient review.