Purpose
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and Duke Energy Progress, LLC (Duke) is to discuss a proposed license amendment request for Shearon Harris Nuclear Power Plant, Unit 1 (HPN), to modify HNP Technical Specification (TS) 3/4.7.5, “Ultimate Heat Sink,” by relocating the minimum water level limits to the licensee-controlled Technical Requirements Manual. The proposed amendment would also update the TS to reflect that either the Auxiliary Reservoir or the Main Reservoir, when operable, meets the associated Limiting Condition for Operation. In addition, an administrative change is proposed to consolidate content from TS Table 6.2-1, “Minimum Shift Crew Composition,” related to the responsibility of the individual designated for the control room command function, into TS 6.1.2.
Meeting Feedback
Meeting Dates and Times
* Date/Time Change *
01/07/26, 9AM - 10AM EST
Meeting Location
Webinar
Webinar
Webinar Meeting Number: 218 483 225 623 85
Webinar Password: q9BG6wQ2
Contact
Tony Sierra
(301) 287-9531
Participation Level
Observation
NRC Participants
NRC Staff
External Participants
Duke Energy
Gordon Curran
Joshua Wilson
Ryan Treadway
Mike Welker
Trae Hartley
Tony Sierra
Dennis Earp Jr.
Docket Numbers - Facility Names
05000400 - Harris 1
Teleconference
Bridge Number: 3015762978
Conference ID: 737459467#
Comments