FOIA/PA-2004-0282 - Resp 2 - Partial.
Accession Number: ML050840051
Date Released: Tuesday, March 29, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML050840053 - FOIA/PA-2004-0282 - Resp 2 - Partial. (12 page(s), 3/21/2005)
- ML040070169 - Point Beach Unit 1, Notification of NRC Inspection and Request for Information. (9 page(s), 1/5/2004)
- ML040980579 - Point Beach, Unit 1 - Request for Approval of Relaxation From Certain Requirements of NRC Order EA-03-009. (6 page(s), 3/30/2004)
- ML040980585 - Revision 0 to SIR-04-032, "Probabilistic Fracture Mechanics Analysis of CRDM Inspection Alternatives at Point Beach, Unit 1." (22 page(s), 3/16/2004)
- ML041480347 - Point Beach Nuclear Plant, Unit 1, Supplement 2 to Reactor Vessel Closure Head Penetration Repair and Flaw Characterization Relief Requests MR 02-018-1. Revision 1 and MR 02-018-2, Revision 1. (5 page(s), 5/20/2004)
- ML041540441 - Point Beach, Unit 1 - NRC Order EA-03-009 Relaxation Request Supplement 3. (9 page(s), 5/21/2004)
- ML041590389 - Point Beach, Unit 1, NRC Order EA-03-009 Relaxation Request Supplement. (38 page(s), 5/14/2004)
- ML041550552 - Point Beach Unit 1 - Relaxation of requirements of first revised order regarding reactor pressure vessel head inspections dated February 20, 2004, (TAC MC2532). (11 page(s), 6/4/2004)
- ML041590404 - Point Beach Nuclear Plant, Unit 1, Supplement 4 to Reactor Vessel Closure Head Penetration Repair and Flaw Characterization Relief Requests MR 02-018-1, Revision 1 and MR 02-018-2, Revision 1. (1 page(s), 5/25/2004)
- ML041740744 - Point Beach, Unit 1, Summary of Spring 2004 Unit 1 (U1R28) Steam Generator Examinations. (3 page(s), 6/10/2004)
- ML050840056 - Key Safe Functions. (4 page(s), 3/21/2005)
- ML050840058 - Executive Summary C128. (1 page(s), 3/21/2005)
- ML050840060 - S/G Nozzle Dam Removal Pre-job Brief. (5 page(s), 3/21/2005)
- ML050840062 - S/G Nozzle Dam Removal Pre-Job Brief Agenda. (1 page(s), 3/21/2005)
- ML050840064 - Operating Experience Table. (12 page(s), 3/21/2005)
- ML050840065 - Briefing Notes for RCS Vent Path Issue. (6 page(s), 3/21/2005)
- ML050840067 - Briefing Notes for Nozzle Dam Installation Breathing Air Supply Issues. (3 page(s), 3/21/2005)
- ML050840069 - S/G Nozzle Dam Removal Pre-job Brief. (8 page(s), 3/21/2005)
- ML050840071 - NMC Root Cause Evaluation Charter: Attachment Q, RCE Report Template. (2 page(s), 3/21/2005)
- ML050840109 - Executive Summary C128. (1 page(s), 3/21/2005)
- ML050840111 - One Column Nozzle Dam Just-in-Time Training. (13 page(s), 3/21/2005)
- ML050840112 - PBNP U1R28 Plan. (3 page(s), 3/21/2005)
- ML050840113 - Use ACEMAN during U1R28. (3 page(s), 3/21/2005)
- ML050840115 - Defined Critical Path. (3 page(s), 3/21/2005)
- ML050840116 - Site Communication. (1 page(s), 3/21/2005)
- ML050840117 - Reduced Inventory. (3 page(s), 3/21/2005)
- ML050840119 - Breaker Shematic. (1 page(s), 3/21/2005)
- ML050840121 - Mainstream. (5 page(s), 6/30/1992)
- ML050840122 - U1R28 Reduced-Inventory Orange Path Contingency Plan. (11 page(s), 3/16/2004)
- ML050840124 - Executive Summary C128 (1 page(s), 3/29/2004)
- ML050840125 - Defined Critical Path. (21 page(s), 3/22/2004)
- ML050840162 - Log Entries Report. (2 page(s), 3/31/2004)
- ML050840163 - Corrective Maintenance Backlog. (1 page(s), 4/30/2004)
- ML050840164 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda 04/02/04. (41 page(s), 4/2/2004)
- ML050840166 - Point Beach Nuclear Plant U1R28 OCC Interactive turnover Meeting Agenda. (25 page(s), 4/2/2004)
- ML050840170 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (41 page(s), 4/3/2004)
- ML050840172 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (43 page(s), 4/3/2004)
- ML050840455 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (43 page(s), 4/3/2004)
- ML050840456 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (41 page(s), 4/3/2004)
- ML050840458 - 04/05/2004, U1R28 Today, Point Beach Refueling Outage Edition. (2 page(s), 4/5/2004)
- ML050840459 - Point Beach Nuclear Plant Status Report for Tuesday, April 06, 2004. (2 page(s), 4/6/2004)
- ML050840461 - U1R28 Today, April 6, 2004, Point Beach Refueling Outage Edition. (2 page(s), 4/6/2004)
- ML050840463 - Outage Status Report for Point Beach, Unit 1, with handwritten notation. (1 page(s), 4/8/2004)
- ML050840464 - Work Order Work Plan MR-01-128*E: MCC 1B42 BUS Bracing Installation-CR/PAB Fan Realignment. (3 page(s), 4/8/2004)
- ML050840467 - Control Room Log Excerpts for Thursday April 8, 2004 and Friday April 9, 2004. (5 page(s), 4/8/2004)
- ML050840490 - Work Order Work Plan MCC 1B42 Bus Bracing Installation CR/PAB for Realignment. (42 page(s), 4/8/2004)
- ML050840492 - Attachment 1, PBNNP SG Nozzle Dam Installation & Vent Path Timeline April 9, 2004. (1 page(s), 4/9/2004)
- ML050840494 - Station Log CRL Excerpts for April 9, 2004. (6 page(s), 4/9/2004)
- ML050840495 - Outage Control Center CRL Excerpts for April 09, 2004. (2 page(s), 4/9/2004)
- ML050840496 - Presentation Slides: Excellence through Prevention. (28 page(s), 4/9/2004)
- ML050840497 - CAP055538 Potential for No Hot Leg Vent Path during Unit 1 SG Nozzle Dam Installation. (2 page(s), 4/9/2004)
- ML050840498 - Industrial Safety Issues and Poor Work Practices During Nozzle Dam Installation. (44 page(s), 4/9/2004)
- ML050840506 - CAP055527 U1R28 Nozzle Dam Installation Supplied Breathing Air Problems. (4 page(s), 4/9/2004)
- ML050840507 - CAP055538 Potential for No Hot Leg Vent Path during Unit 1 SG Nozzle Dam Installation. (2 page(s), 4/9/2004)
- ML050840509 - NMC Incident Response Team for Issues encountered during Unit 1 Reduced Inventory and Nozzle Dam Installation at PBNP - Final Report. (18 page(s), 4/30/2004)
- ML050840510 - Attachment 1: PBNP SG Nozzle Dam Installation & Vent Path Timeline. (1 page(s), 4/9/2004)
- ML050840513 - CAP055576 SG Manway Removal/Installation RMP could generate CL opening without HL vent. (2 page(s), 4/11/2004)
- ML050840517 - CAP055585 Improvement to Hot Leg Vent Path Controls Required. (2 page(s), 4/11/2004)
- ML050840521 - E-mail from R. M. Morris, RIII, to P. Louden, RIII., re: NMC Team Member Added. (1 page(s), 4/11/2004)
- ML050840523 - POD - Point Beach - U1R28. (2 page(s), 4/12/2004)
- ML050840527 - Plant Status Report - Point Beach Nuclear Plant. (2 page(s), 4/12/2004)
- ML050840530 - U1R28 Today - Point Beach Nuclear Plant. (1 page(s), 4/12/2004)
- ML050840531 - U1R28 Nozzle Dam Installation Supplied Breathing Air Problems. (2 page(s), 4/12/2004)
- ML050840533 - Activity Request RCE000254 Root Cause Evaluation Potential for No Hot Leg Vent Path during Unit 1 SG Nozzle Dam Installation. (2 page(s), 4/12/2004)
- ML050840535 - POD - U1R28: Day 11 - Point Beach Refueling Outage Edition. (2 page(s), 4/14/2004)
- ML050840536 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 11. (12 page(s), 4/14/2004)
- ML050870047 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 12. (22 page(s), 4/15/2004)
- ML050870050 - Shift Outage Manager - Days. (1 page(s), 4/19/2004)
- ML050870051 - Note to U1R28 Shift Outage Managers from Sr. Management Representative, re: Work Prior to and During Outage Briefing. (1 page(s), 4/19/2004)
- ML050870052 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 16. (16 page(s), 4/19/2004)
- ML050870056 - Management Expectations (4/20/04). (1 page(s), 4/20/2004)
- ML050870059 - Outage Status Report with handwritten notations. (1 page(s), 4/20/2004)
- ML050870061 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 17. (19 page(s), 4/20/2004)
- ML050870065 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 18. (18 page(s), 4/21/2004)
- ML050870076 - E-Mail from D. Karjale, RIII, to P. Louden, RIII, re: Bullet Nose Followup. (1 page(s), 4/22/2004)
- ML050870082 - RV Head Lift problem preparation for refueling checklist. (15 page(s), 4/22/2004)
- ML050870085 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 19. (36 page(s), 4/22/2004)
- ML050870086 - Plant Status Report - Point Beach Nuclear Plant. (2 page(s), 4/22/2004)
- ML050870090 - Point Beach Event Free Clock Reset. (1 page(s), 4/23/2004)
- ML050870094 - Swing Shift Station Log. (3 page(s), 4/23/2004)
- ML050870112 - Report: Unplanned Isolation of Spent Fuel Cooling (CAP056010). (20 page(s), 4/23/2004)
- ML050870113 - Apparent Cause Evaluation - Point Beach Unit 1. (2 page(s), 4/23/2004)
- ML050870116 - Maintenance Human Performance Clock Reset. (2 page(s), 4/23/2004)
- ML050870118 - POD H.O., with handwritten notations - Point Beach Nuclear Plant U1R28: Day 20. (38 page(s), 4/23/2004)
- ML050870121 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 23. (27 page(s), 4/26/2004)
- ML050870311 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 26. (31 page(s), 4/29/2004)
- ML050870312 - CAP056236 Control Rod contacted top of fuel assembly during RCCA changing. (1 page(s), 4/29/2004)
- ML050870313 - E-mail from R. M. Morris, RIII, to M. Holmberg, RIII, re: Point Beach Head Inspection. (1 page(s), 4/29/2004)
- ML050870315 - Nozzle 26 info. (12 page(s), 4/29/2004)
- ML050870317 - POD H.O. - Point Beach Nuclear Plant U1R28: Day 31. (23 page(s), 5/4/2004)
- ML050870318 - E-Mail from M. Holmberg, RIII, to D. Hills, RIII, re: Point Beach Requested Order Relaxation. (2 page(s), 5/5/2004)
- ML050870319 - Plant Status Report with handwritten notations. (2 page(s), 5/5/2004)
- ML050870320 - POD H. O. - Point Beach Nuclear Plant U1R28: Day 33. (31 page(s), 5/6/2004)
- ML050870321 - Plant Status Report with handwritten notations. (2 page(s), 5/6/2004)
- ML050870324 - E-mail from M. Holmberg, RIII, to D. Hills, RIII, P. Louden, RIII, re: Point Beach RVHP Nozzle Call. (1 page(s), 5/10/2004)
- ML050870325 - Letter from G. D. Van Middlesworth, NMC, to NRC re: Reactor Vessel closure Head Penetration Repair and Flow characterization Relief Requests. (36 page(s), 5/13/2004)
- ML050870326 - Letter from G. D Van Middlesworth, NMC, to NRC re: NRC Order EA-03-009 Relaxation Request Supplement. (38 page(s), 5/14/2004)
- ML050870337 - Supplement 1 to Reactor Vessel Closure Head Penetration Repair and Flaw Characterization Relief Requests MR 02-018-1, Revision 1 and MR 02-018-2, Revision 1. (30 page(s), 5/15/2004)
- ML050870136 - Letter from NMC to NRC re: NRC Order EA-03-009 Relaxation Request supplement 2. (6 page(s), 5/15/2004)
- ML050870137 - PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach, Unit 1. (8 page(s), 5/15/2004)
- ML050870138 - Reactor Coolant System Reduced Inventory Requirements & Nozzle Dam Operational Regs, Unit 1. (40 page(s), 5/18/2004)
- ML050870143 - Letter from NMC to NRC, re: NRC Order EA-03-009 Relaxation Request Supplement 3. (9 page(s), 5/21/2004)
- ML050870146 - Letter from NMC to NRC, re: Supplement 3 to Reactor Vessel Closure Head Penetration Repair and Flaw Characterization Relief Requests MR 02-018-1, Revision 1 and MR 02-018-2, Revision 1. (6 page(s), 5/21/2004)
- ML050870148 - NRC Verbal Authorization of Relief Requests Pertaining to the Unit 1 Reactor Vessel Head. (2 page(s), 5/26/2004)
- ML050870161 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (25 page(s), 6/4/2004)
- ML050870163 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (21 page(s), 6/4/2004)
- ML050870165 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (21 page(s), 6/5/2004)
- ML050870168 - Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda. (21 page(s), 6/5/2004)
- ML050870170 - LER 04-001-00 Point Beach, Unit 1 re Reactor Pressure Vessel Upper Head Penetration 26 Flaw Indications. (5 page(s), 6/25/2004)