Event Notification Report for November 20, 2000

… Event Notification Report for November 20, 2000 … U.S. Nuclear Regulatory Commission Operations Center Event … | FACILITY: SEQUOYAH REGION: 2 |NOTIFICATION DATE: 11/17/2000| | UNIT: [] [2] [] STATE: TN |NOTIFICATION TIME: 10:41[EST]| | … | PLANT HAD A REACTOR TRIP FROM 53% POWER DUE TO A TURBINE …

Information Notice No. 83-51: Diesel Generator Events

… Generator Events … SSINS No.: 6835 IN 83-51 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND … program as well as monitoring equipment through a plant's trend program. Some licensees have instituted such a … on a preventive maintenance schedule for cleaning. SEQUOYAH 2, OCTOBER 20, 1982 During a performance test of …

Event Notification Report for March 14, 2000

… Event Notification Report for March 14, 2000 … U.S. Nuclear Regulatory Commission Operations Center Event … | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 02/19/2000| | RXTYPE: URANIUM … | FACILITY: SEQUOYAH REGION: 2 |NOTIFICATION DATE: 03/14/2000| | UNIT: …

Event Notification Report for March 27, 2009

… Event Notification Report for March 27, 2009 … U.S. Nuclear Regulatory Commission Operations Center Event … NMED NE090006" Power Reactor Event Number: 44934 Facility: SEQUOYAH Region: 2 State: TN Unit: [1] [ ] [ ] RX Type: [1] … 1A Shutdown Board is being powered from the 1A EDG. "The plant is currently being maintained in Mode 3 at …

Event Notification Report for April 29, 2009

… Event Notification Report for April 29, 2009 … U.S. Nuclear Regulatory Commission Operations Center Event … "On April 16, 2009, the Covanta Haverhill trash-to-energy plant requested a routine DOT-E 11406 for the rejection of a … Inspector. Power Reactor Event Number: 45029 Facility: SEQUOYAH Region: 2 State: TN Unit: [1] [ ] [ ] RX Type: [1] …

Event Notification Report for April 24, 2003

… Event Notification Report for April 24, 2003 … U.S. Nuclear Regulatory Commission Operations Center Event … and was subsequently returned to a normal configuration per plant | | procedures. No deficiencies or abnormalities were … | FACILITY: SEQUOYAH REGION: 2 |NOTIFICATION DATE: 04/23/2003| | UNIT: …

Event Notification Report for April 16, 2002

… Event Notification Report for April 16, 2002 … U.S. Nuclear Regulatory Commission Operations Center Event … to the Department as | | being on the laminator in the plant. While performing the inventory for the | | most … | FACILITY: SEQUOYAH REGION: 2 |NOTIFICATION DATE: 04/15/2002| | UNIT: …

Event Notification Report for March 11, 2003

… Event Notification Report for March 11, 2003 … U.S. Nuclear Regulatory Commission Operations Center Event … on 3/9/03, Unit 2 experienced a Safety Injection while the plant | | was stable at NOP(2235 psig)/NOT | | (567 degrees) … | FACILITY: SEQUOYAH REGION: 2 |NOTIFICATION DATE: 03/10/2003| | UNIT: …

Bulletin 85-01: Steam Binding of Auxiliary Feedwater Pumps

… 3150-0011 Expiration Date: 9/30/86 IEB 85-01 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND … backleakage into AFW could occur in any PWR. In a number of plants, the two motor-driven pumps feed into a single pipe … contributor to the core-melt risk for a sample plant (Sequoyah). The case study indicated that unavailability of …

Event Notification Report for January 2, 2003

… Event Notification Report for January 2, 2003 … U.S. Nuclear Regulatory Commission Operations Center Event … | MONTICELLO INITIATED TS REQUIRED PLANT SHUTDOWN DUE TO INOPERABILITY OF BOTH | | EDGs | | | | … | FACILITY: SEQUOYAH REGION: 2 |NOTIFICATION DATE: 01/01/2003| | UNIT: …