Skip to main content

Search Results

Displaying 1 - 10 of 302

Event Notification Report for August 2, 2011

… upon receipt of a failed air start motor from Exelon - Clinton. According to information provided by Clinton Nuclear Plant, they experienced a slow start of an … starting torque to the engine. The inspections performed by Clinton indicated the failed motor had what appeared to be …

Event Notification Report for March 5, 2004

… (Todd Jackson). Power Reactor Event Number: 40555 Facility: CLINTON Region: 3 State: IL Unit: [1] [ ] [ ] RX Type: [1] … Operation 25 Power Operation Event Text DEAD FISH FOUND AT CLINTON POWER STATION The licensee provided the following in … personnel and informed them there was a fish loss on Clinton Lake. Corporate personnel notified Clinton Power …

Event Notification Report for October 17, 2000

… | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 10/16/2000| | UNIT: … FOLLOWING | | REPLACEMENT OF ATWS POWER SUPPLIES | | | | "Clinton Power Station is currently in day 3 of refueling …

Event Notification Report for July 5, 2002

… | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 07/04/2002| | UNIT: … TRIP | | AND LOCKOUT | | | | On July 4, 2002, at 0133, Clinton Power Station scrammed from 94.6% due to a | | …

Event Notification Report for January 30, 2001

… | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 01/29/2001| | UNIT: … | FISH KILL | | | | Clinton Power Station personnel have been investigating the cause of a fish | | kill on Clinton Lake that was first discovered on January 24, 2001. …

Event Notification Report for July 14, 2004

… the licensee. Power Reactor Event Number: 40868 Facility: CLINTON Region: 3 State: IL Unit: [1] [ ] [ ] RX Type: [1] … POSSIBLE ADVERSE WEATHER "On July 13, 2004 at 1610 CDT, the Clinton Power Station 345 KV unit output breakers GCB 4506 … a reactor protection system actuation and reactor scram. Clinton was in Mode 1, operating at 95% rated thermal power …

Event Notification Report for January 18, 2005

… been informed. Power Reactor Event Number: 41331 Facility: CLINTON Region: 3 State: IL Unit: [1] [ ] [ ] RX Type: [1] … via facsimile. "On January 13, 2005, at 1300 [CST] hours, Clinton Lake level reached 694 feet - 0 inches (mean sea level). Normal lake level is 690 feet - 0 inches. Per Clinton Power Station (CPS) procedure 4303.02, "Abnormal …

Event Notification Report for July 3, 2000

… | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 07/01/2000| | UNIT: … | SPDS OUT-OF-SERVICE FOR GREATER THAN 8 HOURS | | | | "Clinton Power Station's Safety Parameter Display System …

Event Notification Report for March 1, 2004

… Inspector. Power Reactor Event Number: 40555 Facility: CLINTON Region: 3 State: IL Unit: [1] [ ] [ ] RX Type: [1] … Operation 25 Power Operation Event Text DEAD FISH FOUND AT CLINTON POWER STATION The licensee provided the following in … personnel and informed them there was a fish loss on Clinton Lake. Corporate personnel notified Clinton Power …

Event Notification Report for January 14, 2005

… press release. Power Reactor Event Number: 41331 Facility: CLINTON Region: 3 State: IL Unit: [1] [ ] [ ] RX Type: [1] … via facsimile. "On January 13, 2005, at 1300 [CST] hours, Clinton Lake level reached 694 feet - 0 inches (mean sea level). Normal lake level is 690 feet - 0 inches. Per Clinton Power Station (CPS) procedure 4303.02, "Abnormal …