Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Regulatory Issue Summaries - 2002

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
RIS-02-23 Availability of Guide For Diagnostic Nuclear Medicine -- 11/27/2002 --
RIS-02-22 Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems S1 05/31/2018 --
Use of EPRI/NEI Joint Task Force Report, "Guideline on Licensing Digital Upgrades: EPRI TR-102348, Revision 1, NEI01-01: a Revision of EPRI TR-102348 to Reflect Changes to the 10 CFR 50.59 Rule" -- 11/25/2002 --
RIS-02-21 National Guard and Other Emergency Responders Located in the Licensee's Controlled Area -- 11/08/2002 --
RIS-02-20 Clarification of Requirements Under 10 CFR 35.432,"Calibration Measurements of Brachytherapy Sources" -- 11/07/2002 --
RIS-02-19 New Modalities to be Regulated under 10 CFR 35.1000 -- 10/21/2002 --
RIS-02-18 Issuance of Orders Imposing Additional Physical Protection Measures for the Transportation Of Spent Nuclear Fuel Greater than 100 Grams -- 10/03/2002 --
RIS-02-17 Guidance on Performing Military Service Verification -- 09/19/2002 --
RIS-02-16 Current Incident Response Issues -- 09/13/2002 --
RIS-02-15 NRC Approval of Commercial Data Encryption Products for the Electronic Transmission of Safeguards Information 1 01/06/2006 --
-- -- --
RIS-02-14 Proposed Changes to the Safety System Unavailability Performance Indicators S1 09/30/2002 --
-- 08/28/2002 --
RIS-02-13 Confirmation of Employment Eligibility -- 08/27/2002 --
RIS-02-12m Manufacturing and Distribution Licensees NRC Threat Advisory and Protective Measures System W Superseded by
RIS 2018-03
06/18
1 08/24/2011 --
-- 01/12/2004 --
RIS-02-12l Panoramic and Underwater Irradiators NRC Threat Advisory and Protective Measures System W Superseded by
RIS 2018-03
06/18
1 08/24/2011 --
-- 06/05/2003 --
RIS-02-12i Transportation of Spent Nuclear Fuel Greater than 100 Grams NRC Threat Advisory and Protective Measures System 2 08/24/2011 --
1 10/03/2002 --
-- 08/19/2002 --
RIS-02-12h Gaseous Diffusion Plants NRC Threat Advisory and Protective Measures System 1 08/24/2011 --
-- 08/19/2002 --
RIS-02-12g Conversion Facility NRC Threat Advisory and Protective Measures System 1 08/24/2011 --
-- 08/19/2002 --
RIS-02-12f Category III Fuel Facilities NRC Threat Advisory and Protective Measures System -- 01/29/2003 --
03/12/2002
Encl.
RIS-02-12e Category I Fuel Facilities NRC Threat Advisory and Protective Measures System 1 08/24/2011 --
-- 08/19/2002 --
RIS-02-12d Independent Spent Fuel Storage Installations Using Dry Storage NRC Threat Advisory and Protective Measures System 1 08/24/2011 --
-- 10/16/2002 --
RIS-02-12c Decommissioning Power Reactors and Independent Spent Fuel Storage Installations Using Wet Storage NRC Threat Advisory and Protective Measures System 1 08/24/2011 --
-- 08/19/2002 --
RIS-02-12b Research and Test Reactors NRC Threat Advisory and Protective Measures System 1 08/24/2011 --
-- 09/09/2002 --
RIS-02-12a Power Reactors NRC Threat Advisory and Protective Measures System 1 08/24/2011 --
-- 08/19/2002 --
RIS-02-12   -- Not Issued --
RIS-02-11 Requalification Program Test Results for Okonite Okolon Single-Conductor Bonded-Jacket Cable (Followup to Regulatory Issue Summary 2000-25) -- 08/09/2002 --
RIS-02-10 Revision of the Skin Dose Limit in 10 CFR Part 20 -- 07/09/2002 --
RIS-02-09 Preparation and Scheduling of Operator Licensing Examinations W 81 FR 31969
05/20/2016
--
  06/06/2002
RIS-02-08 Availability of the Topical Report Program Description and Status on Staff Reviews on the NRC Web Site W 81 FR 73448
10/25/2016
--
-- 05/22/2002 --
RIS-02-07 Clarification of NRC Requirements Applicable to Worker Fatigue and Self-Declarations of Fitness-for-Duty -- 05/10/2002 --
RIS-02-06 Evaluating Occupational Dose for Individuals Exposed to NRC-licensed Material and Medical X-rays W 81 FR 73448
10/25/2016
--
-- 04/16/2002 --
RIS-02-05 NRC Approval of Boiling Water Reactor Pressure Vessel Integrated Surveillance Program -- 04/08/2002 --
RIS-02-04 Results of the Pilot Test of the Proposed Changes to the Unplanned Scrams Performance Indicator and the Scrams with Loss of Normal Heat Removal Performance Indicator -- 03/01/2002 --
RIS-02-03 Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications -- 01/31/2002 --
RIS-02-02 Lessons Learned Related to Recently Submitted Decommissioning Plans and License Termination Plans -- 01/16/2002 --
RIS-02-01 Changes to NRC Participation in the International Nuclear Event Scale -- 01/14/2002 --

To top of page

Page Last Reviewed/Updated Tuesday, March 11, 2025

Page Last Reviewed/Updated Tuesday, March 11, 2025