2018 Aircraft Impact Assessment (AIA) Inspection Reports

The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by applicants, licensees and their contractors. The NRC performs inspections to verify the quality and suitability of the aircraft impact assessment and review any issues identified during the analysis and the corrective actions associated with the issue.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
03/19/18

Korea Hydro and Nuclear Power (KHNP) Co., Ltd., Vienna, VA, inspection of their Advanced Power Reactor 1400 design Aircraft Impact Assessment (AIA). Specifically, to perform an inspection of the corrective actions you have taken to address the notice of violation (NOV) identified in inspection report (IR) 05200046/2016-202, "THE KOREA HYDRO AND NUCLEAR POWER CO. LTD ADVANCED POWER REACTOR 1400 DESIGN AIRCRAFT IMPACT ASSESSMENT INSPECTION, NUCLEAR REGULATORY COMMISSION INSPECTION REPORT NO. 05200046/2016-202."