By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
The purpose of this meeting is to discuss with the nuclear industry and other stakeholders the initiatives within the industry and NRC related to the development and licensing of non-light water reactors
Discuss GEH's responses to requests for additional information (RAIs) and letter associated with their application to renew the ABWR design certification
Tennessee Valley Authority staff will brief the NRC staff on the current status and progress of the actions to improve the chilled work environment in the Operations Department at Watts Bar Nuclear Plant
The Nuclear Regulatory Commission will meet with Industry to discuss Industry's actions taken with regard to the Flowserve Part 21 notification as a result of the valve failure at LaSalle County Nuclear Generating Station, Unit 2.
The purpose of this meeting is for Exelon Generation Company, LLC (Exelon) to discuss with the NRC staff a criticality analysis intended to support its planned license amendment to remove Boraflex credit for Nine Mile Point Nuclear Station, Unit 1.
The purpose of this meeting is to discuss an apparent violation related to an electrical fault that occurred in an emergency station service transformer bus duct at Cooper Nuclear Station. The inspection finding associated with this issue is discussed in NRC Inspection Report…
Public teleconference meeting to discuss technical issues that need to be resolved associated with the NuScale Design Certification Application review in progress and to promote a common understanding of the technical issues associated with staff RAIs.
The purpose of this Federal Remediation Technologies Roundtable (FRTR) Meeting is to identify and discuss existing and new innovative remediation technologies with their technical bases which have been or may be applied for radionuclide and heavy metal contaminants in soil,…
For Tennessee Valley Authority (TVA) to brief NRC staff on its plan to submit a license amendment request to adopt the provisions in 10CFR50.69 "Risk-informed categorization and treatment of structures, systems and components"
The purpose of this meeting is for Tennessee Valley Authority (TVA) to discuss with the NRC staff the status and details of the Browns Ferry Nuclear Plant planned license amendment request (LAR) re: maximum extended load line limit plus (MELLLA+)
To discuss the response to NRC feedback regarding development of the TMRE methodology and related pilot related issues in support of the amendment requests for Shearon Harris Nuclear Power Plant, Vogtle Electric Generating Plant, and Grand Gulf Nuclear Station.
The purpose of this predecisional enforcement conference is to discuss
the two apparent violations identified by the NRC: (1) failure to use a
containment system with a positive fastening device when shipping
radioactive sources; and (2) failure to package a…
The U.S. Nuclear Regulatory Commission (NRC) staff and Korea Hydro and Nuclear Power Co., Ltd. (KHNP), will conduct a public meeting to discuss non-proprietary and proprietary topics of the Advanced Power Reactor 1400 design related to probabilistic risk assessment (PRA), severe…