An official website of the United States government
Here's how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock (
) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
To engage with the public to explain the NRC staff’s regulatory approach to proposing to amend its regulations on categorical exclusions for licensing, regulatory, and administrative actions that individually or cumulatively do not have a significant effect on the human…
The purpose of this meeting is for X-energy to discuss the Reactor Cavity Cooling System (RCCS) system-specific design criteria and related performance requirements during design basis accidents (DBAs).
The U.S. Nuclear Regulatory Commission (NRC) staff will discuss the NRC’s Restart Panel activities including licensing reviews and inspections for the Palisades Nuclear Plant potential resumption of power operations. Holtec Decommissioning Inc. (HDI) will discuss current and…
To Discuss technical details of non-mechanistic tipover analysis for proposed submittal for Amendment 19 to the HI-STORM100 storage system to add multipurpose canisters (with continuous basket shim (CBS))
The meeting is to discuss a license amendment request to be submitted by Dominion Energy that would modify the MTC TSs for Millstone Power Station, Unit 3, North Anna Power Station, Units 1 and 2, and VC Summer, Unit 1.
The purpose of this meeting is for Electric Power Research Institute (EPRI) representatives and NRC staff to discuss EPRI's RAI responses to EPRI Report BWRVIP-100, Revision 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated…
The purpose of this regulatory conference is to discuss the safety significance of a preliminary White finding and associated apparent violation of NRC requirements involving the licensee’s failure to maintain design control for the emergency diesel generator ventilation system.…
The purpose of this meeting is to discuss a program that will provide a basis for extending the liquid penetrate testing (PT) examination frequency for embedded flaw repairs (EFR) performed on reactor vessel head penetrations discussed in WCAP-15897-NP-A, Rev. 2. "The NRC…
To discuss the the traveler TSTF-585, "Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time," specifically TSTF questions regarding NRC staff's comments to draft Revision 3 (ML24067A163). TSTF-585, Revision 3 (draft) is in ADAMS at ML24016A270.
The NRC staff will host a webinar to present the NRC‘s assessment of safety performance at the Dresden Nuclear Power Station, Units 2 and 3 for 2023, as described in the 2023 annual assessment letter. Following the presentation, the NRC will respond to questions specific to the…
The US Nuclear Regulatory Commission plans to meet with the Pressurized Water Reactor Owners Group to provide clarification on draft responses to PWROG-22021 RAIs.
The purpose of this preapplication meeting is to discuss with SMR, LLC's (A Holtec International Company) preliminary considerations for SMR-300 Cyber Security Plan. There will be an open portion for the public to participate (about 30 minutes) and a closed portion (about 90…
The purpose of this meeting is for the Nuclear Regulatory Commission staff and Framatome representatives to hold discussions on the submitted "Licensing Guidance for Lead Test Assemblies" topical report.
The purpose of this public meeting is to share information regarding an NRC initiative to modernize reactor accident analysis regulatory framework and provide interested stakeholders an opportunity to share their perspectives.