To address the scope, purpose, and status of the updates of Regulatory Guide (RG) 4.2, “Preparation of Environmental Reports for Nuclear Power Stations” and “Standard Review Plans for Environmental Reviews for Nuclear Plants” (NUREG-1555). At this meeting, the Nuclear Regulatory…
The purpose of this meeting is to provide members of the community an opportunity to meet with NRC staff members to discuss issues related to the Waterford Steam Electric Station, including the results of the NRC’s assessment of safety performance at the Waterford Steam Electric…
The NRC will meet with the public to discuss the NRC's assessment of safety performance at Calvert Cliffs Nuclear Power Plant for 2015, as described in the annual assessment letter dated March 2, 2016. The NRC will respond to questions on specific performance issues at the…
The purpose of this meeting is to provide an open public forum to discuss the NRC Reactor Oversight Process and the annual assessment of the performance of Virgil C. Summer Nuclear Station, Unit 1. NRC staff will be available, in an informational setting, to answer questions…
Fukushima Subcommittee Meeting - Public Comments Received and Status of Supporting RGs for the Draft Proposed Rulemaking Package for Mitigation of Beyond-Design-Basis Events.
The U.S. Nuclear Regulatory Commission (NRC) staff and Korea Hydro and Nuclear Power Co., Ltd. (KHNP), will discuss proprietary and non-proprietary topics of the Advanced Power Reactor 1400 related to reactor systems, transient and accident analyses described in APR1400 design…
The U.S. Nuclear Regulatory Commission (NRC) staff and Korea Hydro and Nuclear Power Co., Ltd. (KHNP), will discuss non-proprietary topics of the Advanced Power Reactor 1400 related to KHNP's responses to Request for Additional Information (RAI) 311-8278.
The purpose of this public meeting is to discuss: 1) the supplement to draft NUREG 2191, "Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report," Volumes I and II and draft NUREG 2192, "Standard Review Plan for Review of Subsequent License…
The purpose of this meeting is to provide an open forum for discussions between the NRC staff, Nuclear Energy Institute (NEI) and industry representatives related to Hostile Action Based (HAB) exercises. Specifically, to identify and discuss lessons learned from the first cycle…
The purpose of this meeting is to hold a workshop to discuss the data, methods, and tools developed in support of NUREG-2180, "Determining the Effectiveness, Limitations, and Operator Responses for Very Early Warning Fire Detection Systems in Nuclear Facilities (DELORES-…
The purpose is to discuss the proposed license amendment request (LAR) for North Anna Power Station regarding an increase in maximum fuel enrichment for the new fuel storage racks and the spent fuel pool (SFP). The licensee discusses updated SFP geometry requirements, racks…
The purpose of the meeting will be to discuss a potential future MUR power uprate license amendment request that Exelon is considering submitting for PBAPS, Units 2 and 3.
The U.S. Nuclear Regulatory Commission (NRC) staff and Korea Hydro and Nuclear Power Co., Ltd. (KHNP), will discuss proprietary and non-proprietary topics of the Advanced Power Reactor 1400 related to reactor systems, transient and accident analyses described in APR1400 design…
The purpose of the meeting is for AREVA to introduce the mechanical design of the GAIA fuel assembly and discuss the content of the forthcoming topical report