TABLE II: LIST OF ALL THREE MILE ISLAND NUCLEAR PLANT ACTION PLAN ITEMS, TASK ACTION PLAN ITEMS, NEW GENERIC ISSUES, HUMAN FACT
This table contains the priority designations for all issues listed in this report.
This table contains the priority designations for all issues listed in this report.
This section contains the tables relevant to NUREG-0933.
Note: Due to the sensitive nature of some information in this analysis, redactions are necessary in this public version.
On May 26, 2005, the Office of Nuclear Reactor Regulation (NRR), Division of Engineering, recommended that issues related to closed Generic Issue (GI)-19
On March 11, 2011, a 9.0-magnitude earthquake, followed by a 45-foot tsunami, heavily damaged the nuclear power reactors at Japan's Fukushima Dai-ichi facility.
NRC was informed in July 2000 of a medical misadministration during gamma stereotactic radiosurgery that occurred in the State of California in September
Inspections at the gaseous diffusion plants identified that they were not properly applying ANSI/ANS-8.1-1983, "Nuclear Criticality Safety in Operations
On September 19, 2000, BWX Technologies determined that a water leak existed in the Cask Handling Area Pool at their Lynchburg, VA facility.
Several control unit failures in Nucletron Classic Model HDR units occurred over the span of three years: two were reported in 1997; four in 1998; and th
Two misadministrations resulted when a licensee manually edited treatment data for the Nucletron HDR unit.