Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

RELAP5/MOD3.2 Validation Using BETHSY Test 6.9a (NUREG/IA-0188)

On this page:

Download complete document

Publication Information

Date Published: August 2000

Prepared by:
S. Bouabdallah

NNC Ltd.
Booths Hall
Chelford Road
Knutsford, Cheshire
GB–WA16 8QZ
UNITED KINGDOM

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Code Application and Maintenance Program (CAMP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

This report provides the results of a RELAP5/MOD3.2 calculation of Test 6.9a which was carried out on the BETHSY facility. The purpose of the calculation is to provide validation evidence for the use of RELAP5/MOD3.2 for application to faults at Sizewell B which can occur when the plant is in Modes 5 and 6 (and including the use of nozzle dams).