Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for December 23, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   GENERATION ALERT FOR HIGH SYSTEM VOLTAGE    
Calvert Cliffs 2 100   GENERATION ALERT FOR HIGH SYSTEM VOLTAGE    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100     *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 0 12/18/2011 MAINTENANCE OUTAGE - REPLACING A MAIN STEAM SRV - GENERATION ALERT FOR HIGH SYSTEM VOLTAGE    
Limerick 2 100   GENERATION ALERT FOR HIGH SYSTEM VOLTAGE    
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 65   HOLDING POWER WHILE TROUBLESHOOTING AN ISSUE WITH GENERATOR STATOR WATER COOLING    
Susquehanna 1 100   GENERATION ALERT FOR HIGH SYSTEM VOLTAGE    
Susquehanna 2 100   GENERATION ALERT FOR HIGH SYSTEM VOLTAGE    
Three Mile Island 1 100   GENERATION ALERT FOR HIGH SYSTEM VOLTAGE    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100     *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100     *  
Crystal River 3 0 09/25/2009 DEFUELED - CONTAINMENT TENSIONING ON HOLD    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 97   SCHEDULED ROD PATTERN ADJUSTMENT *  
Hatch 2 74   INCREASING POWER *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 0 11/27/2011 REFUELING OUTAGE - DEFUELED    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100     *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 98   INCREASING POWER TO 100% *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 18   HOLDING POWER - TURBINE REPAIRS IN PROGRESS *  
D.C. Cook 1 100     *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 75   HOLDING POWER FOR FEEDWATER TESTING *  
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100     *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 96   POWER LIMITED BASED ON SECOND STAGE MSR ISOLATED    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 90   COASTDOWN TO REFUELING    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 0 11/28/2011 MAINTENANCE OUTAGE    
Waterford 3 100        
Wolf Creek 1 100        

Page Last Reviewed/Updated Thursday, March 25, 2021

Page Last Reviewed/Updated Thursday, March 25, 2021