The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 5, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 99     *  
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100   138/13.8KV FEEDER #95891 DEENERGIZED FOR MAINTENANCE    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 10/08/2011 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 10/23/2011 DEFUELED    
Salem 2 100        
Seabrook 1 100   CONTINGENCY MLCC2    
Susquehanna 1 99     *  
Susquehanna 2 80   1% /HOUR RAMP UP FOLLOWING ROD SEQUENCE EXCHANGE *  
Three Mile Island 1 0 10/24/2011 DEFUELED    
Vermont Yankee 60   HOLDING POWER FOR REACTOR ENGINEERING TESTS *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 76   HOLDING FOR SCRAM TIME TESTING AND ROD SEQUENCE EXCHANGE TRINITY 161 KV LINE OOS *  
Browns Ferry 2 100   TRINITY 161 KV LINE OOS    
Browns Ferry 3 100   TRINITY 161 KV LINE OOS    
Brunswick 1 100        
Brunswick 2 0 11/04/2011 MAINTENANCE OUTAGE *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED; CONTAINMENT TENSIONING ON HOLD    
Farley 1 100        
Farley 2 0 10/09/2011 REFUELING OUTAGE    
Harris 1 100        
Hatch 1 99     *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 08/23/2011 FORCED OUTAGE    
North Anna 2 0 08/23/2011 REFUELING OUTAGE    
Oconee 1 100        
Oconee 2 0 10/21/2011 DEFUELED    
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 85   REDUCED POWER DUE TO 1A1 CIRC WATER PUMP OOS - COMMENCED DILUTION TO BEGIN COASTDOWN    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 75   REDUCED POWER TO REPLACE MOTOR ON HEATER DRAIN PUMP    
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 99   FEEDWATER INSTRUMENT FLOW UNCERTAINTY    
Byron 2 96   REDUCED FOR FEEDWATER HEATER MAINTENANCE *  
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 09/30/2011 MAINTENANCE OUTAGE - REACTOR VESSEL HEAD REPLACEMENT *  
Dresden 2 0 10/16/2011 REFUELING OUTAGE    
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100     *  
Point Beach 1 0 10/02/2011 REFUELING OUTAGE *  
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/16/2011 REFUELING OUTAGE - CORE RELOAD IN PROGRESS    
Arkansas Nuclear 2 100        
Callaway 0 10/15/2011 DEFUELED    
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 96   2ND STAGE MSR LIMITED TO 96% POWER    
Palo Verde 1 0 10/07/2011 REFUELING OUTAGE    
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 0 10/29/2011 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 90   REDUCED POWER TO TROUBLESHOOT PROBLEM FOUND DURING TURBINE STOP VALVE TESTING *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.