Power Reactor Status Report for October 1, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | HIGH SYSTEM VOLTAGE ALERT | * | ||
| Beaver Valley 2 | 100 | HIGH SYSTEM VOLTAGE ALERT | * | ||
| Calvert Cliffs 1 | 95 | WATERBOX CLEANING | * | ||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | UE DECLARED DUE TO CHEMICAL SPILL - SEE EN #47303 | |||
| Limerick 2 | 100 | UE DECLARED DUE TO CHEMICAL SPILL - SEE EN #47303 | |||
| Millstone 2 | 100 | * | |||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 0 | 09/11/2011 | REFUELING OUTAGE | ||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 84 | DECREASE IN POWER DUE TO RIVER GRASSING | * | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| Three Mile Island 1 | 100 | HIGH VOLTAGE ACTION IN MID-ATLANTIC | |||
| Vermont Yankee | 26 | HOLDING FOR RECIRC PUMP MG SET MAINTENANCE | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 23 | INCREASING POWER | * | ||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 95 | ROD IMPROVEMENT | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED; CONTAINMENT TENSIONING ON HOLD | ||
| Farley 1 | 100 | ||||
| Farley 2 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 90 | HOLDING DUE TO SRV LEAKAGE | * | ||
| McGuire 1 | 0 | 09/17/2011 | DEFUELED | ||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 08/23/2011 | FORCED OUTAGE | * | |
| North Anna 2 | 0 | 08/23/2011 | DEFUELED | * | |
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 18 | INCREASING POWER | * | ||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 0 | 09/18/2011 | DEFUELED | ||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 0 | 09/18/2011 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | * | |
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 0 | 09/21/2011 | DEFUELED | ||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 09/30/2011 | MAINTENANCE OUTAGE | * | |
| Dresden 2 | 99 | APPROACHING END OF FUEL CYCLE | |||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 0 | 09/25/2011 | FORCED OUTAGE - RCS HEATUP IN PROGRESS - EXPECT TO ENTER MODE 2 WITHIN THE NEXT 24 HOURS | * | |
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 55 | INCREASING POWER TO 100% | * | ||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
| Grand Gulf 1 | 67 | 2ND STAGE MSR LIMITED TO 96% POWER - REDUCED POWER FOR ROD SEQUENCE EXCHANGE, SCRAM TIME AND CHANNEL BOW TESTING | * | ||
| Palo Verde 1 | 39 | REDUCING POWER FOR CONDENSER TUBE LEAK REPAIRS | |||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | SWITCHYARD RESTRICTION DUE TO EDG OUTAGE ON UNIT 3 | |||
| San Onofre 3 | 100 | SWITCHYARD RESTRICTION DUE TO EDG OUTAGE ON UNIT 3 | |||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021