Power Reactor Status Report for May 21, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | 115 KV LINE #4 OOS FOR MAINTENANCE | * | ||
Ginna | 0 | 05/12/2011 | DEFUELED | ||
Hope Creek 1 | 82 | REDUCED FOR FEEDWATER HEATER REPAIRS | * | ||
Indian Point 2 | 0 | 05/20/2011 | FORCED MAINTENANCE OUTAGE FOR MAIN TRANSFORMER REPAIR | * | |
Indian Point 3 | 100 | ||||
Limerick 1 | 65 | REDUCED POWER FOR TESTING AND MAINTENANCE | * | ||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | 115 KV LINE #1 OOS FOR MAINTENANCE | * | ||
Nine Mile Point 2 | 100 | 115 KV LINE #1 OOS FOR MAINTENANCE | * | ||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 60 | REDUCED FOR ROD PATTERN ADJUSTMENT AND WATER BOX CLEANING | * | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 88 | ROD PATTERN ADJUSTMENT | * | ||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 0 | 03/31/2011 | |||
Susquehanna 1 | 0 | 05/16/2011 | SHUT DOWN FOR PLANNED MAINTENANCE | ||
Susquehanna 2 | 0 | 04/04/2011 | REFUELING OUTAGE | ||
Three Mile Island 1 | 50 | REDUCED FOR COOLING TOWER REPAIRS | * | ||
Vermont Yankee | 90 | LIMITED GENERATION PER ISO NEW ENGLAND REQUEST |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 22 | HOLDING POWER FOR HPCI REPAIRS 2 OUT OF 7 500 KV OFFSITE LINES OOS | * | ||
Browns Ferry 2 | 0 | 04/27/2011 | 2 OUT OF 7 500 KV OFFSITE LINES OOS | ||
Browns Ferry 3 | 0 | 04/27/2011 | 2 OUT OF 7 500 KV OFFSITE LINES OOS | ||
Brunswick 1 | 99 | * | |||
Brunswick 2 | 100 | ||||
Catawba 1 | 0 | 04/23/2011 | CORE RELOAD IN PROGRESS | * | |
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | CORE OFFLOAD IN PROGRESS CONTAINMENT TENSIONING ON HOLD | * | |
Farley 1 | 79 | REDUCING POWER FOR MAIN FEEDWATER PUMP POWER SUPPLY REPAIR | * | ||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 91 | HOLDING POWER ASCENSION | |||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 04/01/2011 | DEFUELED | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 99 | * | |||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 77 | COASTDOWN TO REFUELING OUTAGE | |||
Summer | 0 | 04/15/2011 | EXITING REFUELING OUTAGE | ||
Surry 1 | 100 | ||||
Surry 2 | 0 | 04/16/2011 | EXITING REFUELING OUTAGE | * | |
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | * | |||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 14 | INCREASING POWER | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 99 | REDUCED DUE TO UNCERTAINTY IN FEEDWATER FLOW MEASUREMENT | |||
Braidwood 2 | 99 | REDUCED DUE TO UNCERTAINTY IN FEEDWATER FLOW MEASUREMENT | |||
Byron 1 | 99 | REDUCED DUE TO UNCERTAINTY IN FEEDWATER FLOW MEASUREMENT | |||
Byron 2 | 99 | REDUCED DUE TO UNCERTAINTY IN FEEDWATER FLOW MEASUREMENT | |||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | * | |||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | MAINTENANCE ON 120 KV FERMI-RADKA POWER LINE | |||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 03/04/2011 | EXITING REFUELING OUTAGE | ||
Palisades | 100 | ||||
Perry 1 | 0 | 04/17/2011 | REFUELING OUTAGE | ||
Point Beach 1 | 99 | AUXILIARY FEEDWATER PUMP TEST | * | ||
Point Beach 2 | 0 | 02/28/2011 | REFUELING OUTAGE | ||
Prairie Island 1 | 0 | 04/29/2011 | REFUELING OUTAGE | ||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 0 | 05/08/2011 | REFUELING OUTAGE POWER LINE #403 (356 KV) OOS FOR MAINTENANCE | ||
Quad Cities 2 | 100 | POWER LINE #403 (356 KV) OOS FOR MAINTENANCE |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 0 | 04/02/2011 | REFUELING OUTAGE | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 0 | 05/19/2011 | MANUAL REACTOR TRIP DUE TO CONDENSER TUBE LEAK - SEE EN #46863 | ||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 0 | 04/30/2011 | REFUELING - CORE RELOAD IN PROGRESS | ||
Fort Calhoun | 0 | 04/09/2011 | DEFUELED | ||
Grand Gulf 1 | 96 | POWER LIMITED 2ND STAGE MSR OUT OF SERVICE FOR THE ENTIRE CYCLE | |||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 03/18/2011 | REFUELING OUTAGE |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021