Power Reactor Status Report for May 14, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Beaver Valley 1 | 100 | | | | |
Beaver Valley 2 | 100 | | | | |
Calvert Cliffs 1 | 100 | | | | |
Calvert Cliffs 2 | 100 | | | | |
FitzPatrick | 100 | | | | |
Ginna | 0 | 05/12/2011 | DEFUELED | | |
Hope Creek 1 | 100 | | | | |
Indian Point 2 | 100 | | | | |
Indian Point 3 | 100 | | | | |
Limerick 1 | 100 | | | | |
Limerick 2 | 100 | | | | |
Millstone 2 | 100 | | | | |
Millstone 3 | 100 | | | | |
Nine Mile Point 1 | 0 | 05/02/2011 | AUTOMATIC SCRAM-SEE EN #46808; LINE 4 (115 KV) OFFSITE POWER LINE OOS | | |
Nine Mile Point 2 | 100 | | | | |
Oyster Creek | 100 | | | | |
Peach Bottom 2 | 100 | | | | |
Peach Bottom 3 | 100 | | | | |
Pilgrim 1 | 14 | | SHUTTING DOWN FOR REPAIRS. SEE EN #46852 | * | |
Salem 1 | 100 | | | | |
Salem 2 | 100 | | | * | |
Seabrook 1 | 0 | 03/31/2011 | REFUELING OUTAGE | | |
Susquehanna 1 | 100 | | HIGH SYSTEM VOLTAGE ACTION | | |
Susquehanna 2 | 0 | 04/04/2011 | REFUELING OUTAGE | | |
Three Mile Island 1 | 100 | | HIGH SYSTEM VOLTAGE ACTION | | |
Vermont Yankee | 100 | | | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Browns Ferry 1 | 0 | 04/27/2011 | 500 KV OFFSITE LINES OOS | | |
Browns Ferry 2 | 0 | 04/27/2011 | 500 KV OFFSITE LINES OOS | | |
Browns Ferry 3 | 0 | 04/27/2011 | 500 KV OFFSITE LINES OOS | | |
Brunswick 1 | 0 | 05/13/2011 | PLANNED OUTAGE | * | |
Brunswick 2 | 100 | | | | |
Catawba 1 | 0 | 04/23/2011 | DEFUELED | | |
Catawba 2 | 100 | | | | |
Crystal River 3 | 0 | 09/25/2009 | MAINTENANCE OUTAGE - CONTAINMENT TENSIONING ON HOLD | | |
Farley 1 | 100 | | | | |
Farley 2 | 93 | | MAIN TURBINE VALVE TESTING | * | |
Harris 1 | 100 | | | | |
Hatch 1 | 100 | | | | |
Hatch 2 | 55 | | HOLDING POWER FOR 'B' FEEDPUMP REPAIR | | |
McGuire 1 | 100 | | | | |
McGuire 2 | 100 | | | | |
North Anna 1 | 100 | | | | |
North Anna 2 | 100 | | | | |
Oconee 1 | 0 | 04/01/2011 | DEFUELED | | |
Oconee 2 | 100 | | | | |
Oconee 3 | 100 | | | | |
Robinson 2 | 100 | | | | |
Saint Lucie 1 | 99 | | HOLDING POWER | * | |
Saint Lucie 2 | 100 | | | | |
Sequoyah 1 | 100 | | GRID RISK YELLOW | | |
Sequoyah 2 | 80 | | COASTDOWN TO REFUELING OUTAGE - GRID RISK YELLOW | * | |
Summer | 0 | 04/15/2011 | CORE RELOAD COMPLETE | | |
Surry 1 | 100 | | | | |
Surry 2 | 0 | 04/16/2011 | DEFUELED | | |
Turkey Point 3 | 100 | | | | |
Turkey Point 4 | 0 | 05/05/2011 | HEATING UP | * | |
Vogtle 1 | 100 | | | | |
Vogtle 2 | 100 | | | | |
Watts Bar 1 | 0 | 04/03/2011 | TRANSMISSION SYSTEM ALERT ONE AS A RESULT OF TORNADOES | * | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Braidwood 1 | 100 | | | | |
Braidwood 2 | 48 | | INCREASING POWER | * | |
Byron 1 | 100 | | | | |
Byron 2 | 100 | | | | |
Clinton | 97 | | 100% ELECTRICAL CAPABILITY | | |
D.C. Cook 1 | 100 | | | | |
D.C. Cook 2 | 100 | | | | |
Davis-Besse | 100 | | | | |
Dresden 2 | 100 | | | * | |
Dresden 3 | 100 | | | * | |
Duane Arnold | 100 | | | | |
Fermi 2 | 100 | | | | |
Kewaunee | 100 | | | | |
La Salle 1 | 100 | | | | |
La Salle 2 | 100 | | | | |
Monticello | 0 | 03/04/2011 | EXITING REFUELING OUTAGE | | |
Palisades | 100 | | | | |
Perry 1 | 0 | 04/17/2011 | REFUELING OUTAGE | | |
Point Beach 1 | 100 | | | | |
Point Beach 2 | 0 | 02/28/2011 | REFUELING OUTAGE | | |
Prairie Island 1 | 0 | 04/29/2011 | REFUELING OUTAGE | | |
Prairie Island 2 | 100 | | | | |
Quad Cities 1 | 0 | 05/08/2011 | REFUELING OUTAGE | | |
Quad Cities 2 | 100 | | | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Arkansas Nuclear 1 | 96 | | INCREASING POWER | * | |
Arkansas Nuclear 2 | 100 | | | | |
Callaway | 100 | | | | |
Columbia Generating Station | 0 | 04/02/2011 | REFUELING OUTAGE | | |
Comanche Peak 1 | 100 | | | | |
Comanche Peak 2 | 100 | | | | |
Cooper | 100 | | | * | |
Diablo Canyon 1 | 100 | | | | |
Diablo Canyon 2 | 0 | 04/30/2011 | DEFUELED | | |
Fort Calhoun | 0 | 04/09/2011 | DEFUELED | | |
Grand Gulf 1 | 96 | | POWER LIMITED 2ND STAGE MSR OUT OF SERVICE FOR THE ENTIRE CYCLE | | |
Palo Verde 1 | 100 | | | | |
Palo Verde 2 | 100 | | | | |
Palo Verde 3 | 100 | | | | |
River Bend 1 | 100 | | | | |
San Onofre 2 | 98 | | | * | |
San Onofre 3 | 100 | | | | |
South Texas 1 | 100 | | | | |
South Texas 2 | 100 | | | | |
Waterford 3 | 27 | | MAKING PREPARATIONS TO PLACE THE TURBINE ONLINE AFTER DOWNPOWERING TO REPAIR A GENERATOR HYDROGEN LEAK. | * | |
Wolf Creek 1 | 0 | 03/18/2011 | REFUELING OUTAGE | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.