Part 21 Report - 1998-136
ACCESSION #: 9806160464
The Boeing Company
P.O. Box 3707
Seattle, WA 98124-2207
June 10, 1998
G-1151-SJA-98-288
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555
BOEING
Reference: a) Boeing Letter G-1 151 -RSO-92-365 dated August 31, 1992;
R. S. Orr to the NRC Operations Center
b) NRC Letter Docket No. 99901227 dated August 12, 1992; L.
J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21
Inquiry
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is
sending the NRC the attached error notice(s) received from our former
software suppliers. Because of unknown current addresses, the following
former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Error notices have been sent to our other former customers.
Very truly yours,
Sandra J. Andrews
Nuclear Administrator
Phone: (425) 865-6248
FAX: (425) 865-4851
Mail Stop: 7A-33, or
e-mail: Sandra.J.Andrews@Boeing.com
Enclosure(s): GTSTRUDL Program report form 98.08
Georgia Institute JUN 08 1998
of Technology GTSTRUDL[Registered Trademark]
May 29, 1998
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O.Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 98.08, and a
GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and return the
GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the
GTSTRUDL Program Report.
Thank you for reviewing the Program Report and for returning the
Acknowledgement Form.
Best regards,
CASE Center
David C. Key
Configuration Control Manager
Enclosures
Computer Aided Structural Engineering Center Phone: (404) 894-2260
School of Civil & Environmental Engineering Fax: (404) 894-8014
Atlanta, Georgia 30332-0355 USA casec@ce.gatech.edu
A Unit of the University System of Georgia
GTSTRUDL Program Report Form
GPRF No.: 98.08
DATE: 5/26/98
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
_ URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within the
session or job.
_SERIOUS Problem results in incorrect answers which are obvious or
problem prevents completion of a particular user's task.
_MINOR Problem can be worked around or problem poses high
frustration factor.
xINFORMATIVE Documentation error, program usage tip, user inconveniences.
Date Problem Confirmed May 26, 1998
Date Notification Sent
Computers All
Operating System All
Versions: All
Target Release for Correction: 9801 NT Verification Manual
Signature Title
R & D Division
Typed or Printed Name Date of Signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev. 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.: 98.08
DATE: 5/26/98
DESCRIPTION:
There were several errors discovered in the GTSTRUDL Verification Manual
in the course of a recent review. These issues are as follows:
1. In VDY11, the second equation on page 3.11-1 is missing the minus
sign in front of the 'e'.
2. In the problem description for VRC05, the GTSTRUDL design matched
the Reference design, except that the problem description should
have stated 100 k-ft and 80 k-in instead of 100 k-in and 80 k-in.
The actual run used the proper units, only the manual is incorrect.
3. For VTA15, some of the values listed in the tables have their values
switched. The formulas specified on page 8.15-3 and 8.15-4 are
incorrect for iy iz sy sz ry rz, causing the values for y and z to
be reversed in the table on pages 8.15-5 and 8.15-6. The correct
formulas were used to create the properties in the GTSTRUDL tables,
only the manual is incorrect.
Rev. 2.2
*** END OF DOCUMENT ***