Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Part 21 Report - 1998-103

#33536


CITRS Event Detail Report

Source CITAS # Occurance Date Operatibility Location Methode Code Priority Reportable Originator System K2MIS #
SOR 98-E00356 1/14/98 4:54:00 PM CB NO NO Santini, Philip 480V

Event Description:

January 14, 1998
Indiana Point Unit No.2
Docket No. 50-247

Part 21 Notification - Westinghouse Breaker Overhaul Work

This report is being made per 10CFR21(d) (3)(i), Reporting of Defects and Noncompliance.

During performance of a comprehensive investigation of Westinghouse supplied DB-50 breakers, it was determined that low trip bar forces, and winding of the trip pan spring contributed to breaker miss-operation which might have resulted in the breakers malfunctioning when called upon to perform their safety related function. These breaker anomalies were previously reported to the NRC order LER 97-024.

Immediate Actions:

Assignor Assignee Assignment Status Due Date Last Updated Action
Santini, Philip DMRG, Daily Mgm Review Grp Review Event New 1/21/98 1/14/98

Event Summary:

Root Cause:
Santini, Philip SWS, Shift Watch Sup. Review Event New 1/14/98 1/14/98
Event Summary:
Root Cause:
Santini, Philip WE, Watch Fag. Review Event New 1/14/98 1/14/98
Event Summary:
Root Cause:

Westinghouse Repair and Replacement Services
2000 Cheswick Ave
Cheswick, PA