Advanced Safety Evaluations for William States Lee III Nuclear Station, Units 1 and 2 Application

The following table provides access to Advanced Safety Evaluations that the NRC has issued in connection with its review of the COL application that Duke Energy submitted for William States Lee III Nuclear Station, Units 1 & 2.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and Interfaces TBD
2 Site Characteristics TBD
3 Design of Structures, Components, Equipment, and Systems TBD
4 Reactor 01/04/12
5 Reactor Coolant System and Connected Systems TBD
6 Engineered Safety Features TBD
7 Instrumentation and Controls 10/11/11
8 Electric Power TBD
9 Auxiliary Systems 01/17/12
10 Steam and Power Conversion TBD
11 Radioactive Waste Management TBD
12 Radiation Protection TBD
13 Conduct of Operations TBD
14 Initial Test Program 11/01/11
15 Accident Analysis 11/18/11
16 Technical Specifications 07/19/11
17 Quality Assurance 10/19/11
18 Human Factors Engineering TBD
19 Response to Severe Accident Policy Statement TBD