By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
This meeting will be a hybrid meeting and use Microsoft Teams. The purpose of this technical exchange is to facilitate an exchange of technical information about advanced reactor deployment, design codes, materials management, and the licensing processes.
The purpose of this meeting is to exchange technical information related to the activities of
industry materials programs (Electric Power Research Institute (EPRI) Materials Reliability
Program (MRP), EPRI Boiling Water Reactor (BWR) Vessels and Internals Project…
Meeting with TSTF members to discuss NRC staff comments and questions regarding Draft TSTF-610, Elimination of the Term Core Alteration in BWR Technical Specifications (ML26105A761).
NRC and DOE NNSA will discuss Codes and Methods for qualification of new high-density HALEU fuel, the associated fuel fabrication capabilities, and activities necessary to convert the NRC-regulated U.S. high performance research reactors from HEU to HALEU fuel.
Members of the NRC staff will present the NRC’s assessment of safety performance at Diablo Canyon Power Plant for 2025, as described in the 2025 annual assessment letter. The staff will make this presentation at a meeting of the Diablo Canyon Independent Safety Committee (DCISC)…
The NRC and Deployable Energy Limited (DE) will conduct a pre-application meeting regarding the Unity Nuclear Battery (UNB) microreactor design. DE intends to discuss its accident analysis methodology and associated validations during the meeting.
The purpose of this meeting between the U.S. Nuclear Regulatory Commission (NRC) and Constellation Energy Generation, LLC (Constellation) is to discuss a proposed license amendment for an extension of license renewal commitment for the component cooling water heat exchangers…
The purpose of the meeting is for the U. S. Nuclear Regulatory Commission (NRC) staff to discuss proprietary information related to the acceptance review of Global Nuclear Fuels - Americas, LLC (GNFA) topical reports (TRs) NEDC-33256P-A, Revision 3, NEDC-33257P-A, Revision 3, and…
The NRC staff will host an open forum to present the NRC’s assessment of safety performance at Donald C. Cook Nuclear Plant, Units 1 and 2 for 2025, as described in the 2025 annual assessment letter. The NRC staff will be available to respond to questions specific to the safety…
The purpose of this meeting is to discuss the Nuclear Energy Institute (NEI) Technical Report NEI 23-01, Revision 2, “Operator Cold License Training Plan for Advanced Nuclear Reactors” (ML25198A361). In this meeting NRC staff will discuss comments on the report and NEI's…
The purpose of this meeting is for the Nuclear Regulatory Commission Staff to hold Pre-submittal Meeting Discussions with Framatome Inc. (Framatome) Representatives Regarding the Realistic Small Break Loss of Coolant Accident (LOCA) Methodology for Pressurized Water Reactors (…
The purpose of this meeting between Pacific Gas and Electric Company (PG&E, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to provide information regarding potential license amendment requests for (1) ultimate heat sink analysis based on industry…
The purpose of this call is for the U.S Nuclear Regulatory Commission and Global Laser Enrichment, LLC. staff to ensure mutual understanding of draft responses to the Integrated Safety Analysis Summary Set 9, requests for additional information to support the Paducah Laser…
The U.S. Nuclear Regulatory Commission (NRC) staff will hold a meeting with representatives from ARC Clean Technology (ARC) to discuss functional containment and sodium fires pertaining to the ARC-100 sodium-cooled fast reactor design. During this meeting, ARC will present…
Pre-submittal meeting to discuss a planned license amendment request to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown, for the Prairie Island Nuclear Generating Plant, Units 1 and 2.
The purpose of the meeting is to hear Southern Nuclear Operating Company's plan to submit two alternative requests to change intervals for testing or replacement regarding squib valves at Vogtle 3 and 4.
The NRC staff will host an open forum to discuss the NRC’s assessment of safety performance at Clinton Power Station for 2025, as described in the 2025 annual assessment letter.
The NRC staff will be available to respond to questions specific to the safety performance of…
The purpose of this meeting is for NextEra Energy Point Beach, LLC (NextEra, the licensee) to provide information on planned licensing actions for Point Beach Nuclear Plant, Units 1 and 2, related to Subsequent Renewed License Commitment 38i), “Structures Monitoring Aging…
To follow up on the discussion and slides presented during May 28, 2026, second pre-submittal meeting with Westinghouse Electric Company (Westinghouse) when Westinghouse presented to the U.S. Nuclear
Regulatory Commission (NRC) proprietary information related to the future…