NRC staff and representatives from Kairos Power will discuss the content of the environmental report portion of a construction permit application for the Hermes test reactor.
The purpose of this virtual meeting between the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Valley Authority (TVA) is to discuss potential mid-cycle outage contingencies and steam generator tube locking as a basis for reducing tube burst probability.
The purpose of this meeting, between Southern Nuclear Operating Company, Inc. (SNC, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) is to hear SNC's plan to submit a license amendment request (LAR) to remove the function, "Main Steam Line Isolation -…
The purpose of this recurring weekly meeting is to discuss issues and clarifications on the
draft implementation guidance document (NEI 20-05) related to proposed rulemaking of
alternative physical security requirements for non-light water reactors and small modular…
The purpose of this meeting is to discuss the proposed submittal of an application with a repair to identified damage on the Unit 3 intake cooling water discharge line.
Public teleconference meeting to discuss the pre-application matters related to construction permitting of the GEH BWRX-300 power reactor design. A portion of the meeting may be closed to the public for discussion of proprietary information.
The purpose of the meeting is to hear SNC’s plan to submit a proposed LAR to revise TS 3.7.2 to eliminate one of the two MSIVs in each steam line for Vogtle, Units 1 and 2.
The purpose of this meeting is for TerraPower and NRC staff to discuss the process and methodology for establishing the initial set of Principal Design Criteria (PDC) and for evaluating applicable regulations for the Natrium Plant Design.
NextEra Energy/Florida Power & Light Company (NextEra/FPL) and the U.S. Nuclear Regulatory Commission (NRC) will discuss the planned digital instrumentation and control license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4, and other technical…
The U.S. Nuclear Regulatory Commission will conduct a scoping process to gather information necessary to prepare an environmental impact statement to evaluate the environmental impacts for the subsequent license renewal of the operating licenses for Oconee Nuclear Station, Unit…
To discuss issues associated with the safety review of licensing actions and/or Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) closures for SNC's Vogtle Electric Generating Plant, Units 3 and 4
The purpose of these periodic advanced reactor stakeholder meetings is to share information and discuss topics related to the development and licensing of advanced reactors with the nuclear industry and other stakeholders.
The purpose of this meeting is to gather further information on the issues associated with the NRC's June 1, 2021, "Notice of Interpretation on Industrial Radiographic Operations at Temporary Radiography Jobsites and an Agreement State Compatibility Category Change…
Public webinar and teleconference meeting to allow the public an opportunity to provide comments on the Draft Environmental Impact Statement (DEIS) for the Westinghouse Columbia Fuel Fabrication Facility (CFFF) license renewal application.
The purpose of this recurring weekly meeting is to discuss issues and clarifications on the
draft implementation guidance document (NEI 20-05) related to proposed rulemaking of
alternative physical security requirements for non-light water reactors and small modular…
This is a pre-application meeting to discuss a proposed revision to the conditional exemption of the end-of-cycle moderator temperature coefficient measurement methodology required by technical specification surveillance requirement 3.1.3.2.