By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
The purpose of the webinar is for Exelon Generation Company, LLC (Exelon) to describe any variations in its license amendment request for Nine Mile Point Nuclear Station, Unit 2, from the technical specification changes described in TSTF-542, "Reactor Pressure Vessel Water…
The purpose of the meeting is to discuss several topics with regards to Low Level Waste, including the Low Level Waste Programmatic Assessment, Very Low Level Waste, and 10 CFR Part 61, “Licensing Requirements for Land Disposal of Radioactive Waste.” .
The purpose of this meeting is to discuss outstanding information needs with Southern Nuclear Operating Company, Inc., regarding its license amendment request to implement a Risk-Informed Technical Specification Completion Time Program at Vogtle Electric Generating Plant, Units 1…
To discuss issues associated with the safety review of licensing actions for SNC's Vogtle Electric Generating Plant, Units 3 and 4 and SCE&G's V. C. Summer Nuclear Station, Units 2 and 3.
Discuss GEH's responses to requests for additional information (RAIs) and letter associated with their application to renew the ABWR design certification
The U.S. Nuclear Regulatory Commission (NRC) staff and Korea Hydro and Nuclear Power Co., Ltd. (KHNP), will conduct a one-day public meeting to discuss proprietary and non-proprietary topics of the Advanced Power Reactor 1400 related to probabilistic risk assessment (PRA), severe…
To discuss staff's safety evaluation report related to NuScale topical report entitled, "Safety Classification of Passive Nuclear Power Plant Electrical Systems".
The purpose of this meeting is for Entergy Nuclear Operations, Inc. to discuss with the U.S. Nuclear Regulatory Commission a proposed license amendment request regarding the cyber security plan implementation schedule for the Palisades Nuclear Plant.
The purpose of this meeting is to discuss a planned license amendment request for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2. The licensee plans to submit a request to make changes to the licenses for Donald C. Cook, Unit Nos. 1 and 2, related to the Fire Protection Plan.…
To discuss a proposed Traveler to revise the (TS) Safety Limit (SL) value and method of calculation for the Minimum Critical Power Ratio (MCPR), SL 2.1.1.2, for Boiling Water Reactor (BWR) plants using General Electric or Westinghouse fuel. There is no meeting agenda because the…
The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC’s assessment of safety performance at Beaver Valley Power Station, Units 1 and 2 for 2016, as described in the Annual Assessment Letter dated March 1, 2017. The NRC will respond to…
The purpose of this meeting is to provide opportunities to discuss a finding that the NRC has preliminarily determined to be White, with low-to-moderate safety significance, for the St. Lucie Nuclear Plant (refer to inspection report 05000335/2016012)
The NRC staff will meet with Entergy to discuss the NRC's assessment of safety performance at the Pilgrim Nuclear Power Station during the 2016 calendar year, as described in the NRC annual assessment letter dated March 1, 2017. The NRC will also discuss preliminary…
The U.S. Nuclear Regulatory Commission (NRC) staff and Korea Hydro and Nuclear Power Co., Ltd. (KHNP), will discuss non-proprietary topics of the Advanced Power Reactor 1400 related to Section 3.8.5 Construction Sequence.