By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
To provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's environmental review of the license renewal environmental report for Browns Ferry Nuclear Plant, Units 1, 2 and 3, as documented in its draft supplemental environmental impact statement, and…
The NRC staff will host an open forum to present the NRC’s assessment of safety performance at Monticello Nuclear Generating Plant for 2024, as described in the 2024 annual assessment letter. The NRC staff will respond to questions specific to the safety performance of the…
The NRC staff will host an open forum to present the NRC’s assessment of safety performance at Clinton Power Station for 2024, as described in the 2024 annual assessment letter. During the open house, the NRC will respond to questions specific to the safety performance of the…
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Valley Authority (TVA) is to discuss a potential alternative request regarding testing of thermal relief valves.
To Discuss the Proposed Limitations and Conditions in the NRC Staff's Safety Evaluation for Proprietary Review for EPRI Report 3002025288, “Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components”
Westinghouse has requested this meeting with the U.S. Nuclear Regulatory Commission (NRC) staff to discuss their ISA and Management Measures for its proposed Low Enriched Uranium Plus (LEU+) expansion at the Columbia Fuel Fabrication Facility (CFFF). A portion of the meeting will…
The purpose of this meeting is to exchange technical information related to the activities of
industry materials programs (Electric Power Research Institute (EPRI) Materials Reliability
Program (MRP), EPRI Boiling Water Reactor (BWR) Vessels and Internals Project…
The purpose of this meeting between Entergy Operations, Inc. (Entergy, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff is to discuss a proposed license amendment request (LAR) regarding pressurizer heater capacity. A prior meeting on this topic was held on…
To provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's environmental review of the license renewal environmental report for Dresden Power Plant Units 2 and 3, as documented in its draft supplemental environmental impact statement, and provide an…
The purpose of this pre-application meeting is to discuss a potential forthcoming topical report on Terra Innovatum's SOLO reactor safeguards design and plan.
The purpose of this meeting between Vistra Operations Company LLC (Vistra OpCo, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff is to discuss Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, proposed alternative for the containment moisture barrier…
The NRC staff will discuss its assessment of safety performance at Point Beach Nuclear Power Plant, Units 1 and 2, for 2024, as described in the 2024 annual assessment letter. The presentation will be given during a Village of Mishicot Board meeting. NRC staff will be available…
This is a pre-application meeting for the NRC to provide Global Laser Enrichment observations on the draft license application chapter 3 the Integrated Safety Analysis so the NRC and GLE will align on mutual understandings
The purpose of this meeting between the U.S. Nuclear Regulatory Commission (NRC) and the US Maritime Administration is to discuss the proposed submittal of the final status surveys for the decommissioning of the Nuclear Ship (NS) Savannah.
The meeting is to discuss a proposed license amendment request for Clinton Power Station to update its methodology for performing reactor protection system Main Steam Isolation Valve (MSIV) closure response time testing.
The purpose of this meeting between Pacific Gas and Electric Company (PG&E, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss the NRC staff's review of license amendment and exemption requests for Diablo Canyon Nuclear Power Plant, Units…