Special NRC Oversight at Fort Calhoun Station
Fort Calhoun moved back to normal oversight as per the closure letter dated March 30, 2015
As a result of the continuous performance assessment of Fort Calhoun Station (FCS), the U.S. Nuclear Regulatory Commission (NRC) modified its regulatory oversight of FCS, effective December 13, 2011, to address several performance issues that were identified during an extended shutdown of the plant. FCS initially shut down for a scheduled refueling outage in April 2011, but that outage was subsequently extended to address longstanding technical issues, as well as issues associated with the Missouri River flooding that affected the plant from June through September 2011. Because the identified performance issues will require additional oversight, the NRC will now follow Inspection Manual Chapter 0350 (IMC 0350), "Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns," rather than the usual IMC 0305, "Operating Reactor Assessment Program."
The following table lists the publicly available documents that the NRC has issued in connection with the special oversight of FCS.
Also on this page:
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date | Title/Description |
---|---|
02/12/2015 | NRC Integrated Inspection Report |
12/02/2014 | Public Meeting Summary |
12/02/2014 | Public Meeting with Omaha Public Power District |
11/25/2014 | NRC Team Inspection Report |
11/13/2014 | NRC Integrated Inspection Report |
09/25/2014 | Public Meeting Summary |
09/18/2014 | NRC Confirmatory Action Letter Follow Up Inspection and Problem Identification and Resolution Inspection Report |
09/08/2014 | NRC Public Meeting Notice |
07/29/2014 | NRC Integrated Inspection Report |
06/25/2014 | NRC Temporary Instruction Inspection Report |
06/17/2014 | Public Meeting Summary |
05/22/2014 | Public Meeting Summary |
05/20/2014 | NRC Integrated Inspection Report |
05/14/2014 | NRC Integrated Inspection Report |
05/13/2014 | Public Meeting with Omaha Public Power District Summary |
05/13/2014 | Closed Meeting Summary with Army Corps of Engineers, Nuclear Regulatory Commission, Omaha Public Power District, and Nebraska Public Power District |
05/09/2014 | Public Meeting Summary |
05/09/2014 | Closed Meeting Summary with Omaha Public Power District |
05/06/2014 | NRC Triennial Heat Exchanger Inspection |
04/25/2014 | NRC Public Meeting Notice |
04/25/2014 | NRC Special Oversight Inspection Report |
04/03/2014 | NRC Team Inspection Report |
03/19/2014 | NRC Integrated Inspection Report |
02/27/2014 | Public Meeting Summary |
02/13/2014 | NRC Public Meeting Notice |
02/10/2014 | NRC Integrated Inspection Report |
12/17/2013 | Fort Calhoun Station Closure of Confirmatory Action Letter |
12/17/2013 | Confirmatory Action Letter – Fort Calhoun Station |
12/17/2013 | NRC Restart Press Release |
12/16/2013 | Recommendation for NRC to Close Confirmatory Action Letter EA-13-020 Supporting the Restart of Fort Calhoun Station and Recommendation to Issue Post-Restart Confirmatory Action Letter |
12/11/2013 | NRC Integrated Inspection Report |
12/02/2013 | Integrated Report to Support Restart of Fort Calhoun Station and Post-Restart Commitments for Sustained Improvement |
11/21/2013 | Public Meeting Summary |
11/15/2013 | Current Status of NRC Restart Checklist and Basis Documents |
11/13/2013 | Public Meeting Notice with Omaha Public Power District Press Release |
11/08/2013 | Public Meeting Notice with Omaha Public Power District |
09/24/2013 | Public Meeting with Omaha Public Power District |
09/23/2013 | NRC Integrated Inspection Report |
09/19/2013 | Current Status of NRC Restart Checklist and Basis Documents |
09/12/2013 | Public Meeting Notice with Omaha Public Power District |
08/15/2013 | Public Meeting Notice with Omaha Public Power District |
08/09/2013 | NRC Integrated Inspection Report |
08/01/2013 | NRC IMC 0350 Security Team Inspection Report |
07/16/2013 | NRC Team Inspection Report |
07/11/2013 | NRC IMC 0350 Inspection Report |
07/11/2013 | Public Meeting Notice |
06/13/2013 | NRC Integrated Inspection Report |
05/24/2013 | NRC Special Inspection Report |
05/17/2013 | Summary of Public Meeting with Omaha Public Power District |
05/06/2013 | Public Meeting Notice With Omaha Public Power District |
04/24/2013 | Security Inspection Report |
04/24/2013 | Independent Spent Fuel Storage Installation Inspection Report |
04/22/2013 | Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions (Handouts) |
04/17/2013 | Public Meeting Notice With Omaha Public Power District |
04/03/2013 | Summary of Public Meeting |
04/02/2013 | NRC Integrated Inspection Report |
03/27/2013 | Summary of Public Meeting with Omaha Public Power District |
03/11/2013 | NRC Inspection Report |
03/07/2013 | Restart Checklist Basis Document (Revised) |
03/07/2013 | Public Meeting Notice |
02/26/2013 | Confirmatory Action Letter and Restart Checklist (Revised) |
02/14/2013 | NRC Integrated Inspection Report |
12/21/2012 | NRC Integrated Inspection report |
12/12/2012 | OPPD Slide Presentation Regarding Containment Internal Structures |
11/15/2012 | Summary of Public Meeting with Omaha Public Power District |
11/13/2012 | NRC Resident Inspection Report |
11/13/2012 | Restart Checklist Basis Document |
10/25/2012 | Public Meeting Notice |
10/02/2012 | NRC Resident Inspection Report |
09/07/2012 | Revised Fort Calhoun Station Manual Chapter 0350 Oversight Panel Charter |
08/23/2012 | Summary of Public Meeting with Omaha Public Power District |
08/13/2012 | NRC Resident Inspection Report |
07/17/2012 | Summary of Public Meeting with Omaha Public Power District |
07/09/2012 | Fort Calhoun Station Integrated Performance Improvement Plan |
06/29/2012 | Public Meeting Notice |
06/13/2012 | Triennial Fire Protection Inspection Report |
06/13/2012 | Designation of NRC Oversight Panel Chairman |
06/11/2012 | Fort Calhoun Station Response to NRC Inspection Report 2012002 |
06/11/2012 | Confirmatory Action Letter and Restart Checklist |
05/02/2012 | Public Meeting Notice |
04/04/2012 | Summary of Public Meeting with Omaha Public Power District |
02/22/2012 | Transcript of Public Meeting Held at NRC, Briefing on Fort Calhoun Station: |
02/12/2012 | Manual Chapter 0350 Panel Process Plan for Fort Calhoun Station |
01/19/2012 | Summary of Public Meeting with Omaha Public Power District |
01/12/2012 | Fort Calhoun Station Manual Chapter 0350 Oversight Panel Charter |
12/13/2011 | Notification of Change to Regulatory Oversight of Fort Calhoun Station |
09/02/2011 | Confirmatory Action Letter |
Electrical Switchgear Fire Event
-
A fire occurred on June 7, 2011, in electrical switchgear that distributes power to vital systems and components needed for the safe shutdown of the plant. This fire affected two independent trains of the system and resulted in the NRC issuing a preliminary red finding on March 12, 2012, following a special inspection. The special inspection report is found in the below documents.
-
The fire started in a replacement electrical breaker that was modified to fit inside the existing electrical switchgear. The replacement breaker was installed and in service for about 18 months before the fire occurred.
-
Poor alignment between electrical components and inadequate cleaning of the connections (hardened grease at the interface) increased the electrical resistance at their junction. These conditions created a buildup of heat that caused a fire affecting one train; electrically conductive soot and smoke spread past a barrier and tripped the breaker on the opposing train. This electrical fault resulted in the complete loss of spent fuel pool cooling for approximately 90 minutes, resulting in a 3°F temperature rise in the pool.
-
Fort Calhoun Station staff has taken compensatory measures to ensure that high resistance connections were corrected in the other affected load centers, and reactor shutdown cooling systems were not directly affected. The NRC is in the process of reviewing Fort Calhoun Station's actions in response to the fire. The reactor at Fort Calhoun Station is currently shutdown and will not be allowed to restart until the IMC 0350 Panel grants approval.
Date | Description |
---|---|
05/24/2012 | OPPD Reply to Red Finding |
04/10/2012 | Final Significance of Red Finding |
03/12/2012 | Special Inspection Report |
10/27/2011 | Licensee Event Report |
09/12/2011 | NRC Press Release |
06/08/2011 | ALERT Exited |
06/07/2011 | ALERT Declared |