The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
ACRS Meetings
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| ACRS Meeting Date | Topics | Related Documents |
|---|---|---|
| 12/04/2012 | Technical Analysis Approach Plan – General approaches, assumptions, challenges for reactor, at-power, Level 1 for internal events, internal floods, internal fire, seismic, high winds, and other hazards; reactor, LPSD, Level 1 for internal events; Level 2 PRA; Level 3 PRA; HRA; integrated site risk; uncertainty analysis; and quality assurance | |
| 05/22/2013 | Technical Analysis Approach Plan (cont.) – General approaches, assumptions, challenges for quality assurance (updated), spent fuel pool PRA, and dry cask storage PRA | |
| 07/22/2013 | Integrated Site Risk Human Reliability Analysis Initial Level 1 Internal Events Model (closed session) |
|
| 02/19/2014 | Site Operating Phases Level 2 PRA Methods and Status Level 3 PRA Approach and Status SNC Perspectives |
|
| 06/11/2014 | Full Committee – project overview | |
| 10/15/2014 | Level 2 PRA HRA approach (open session) and implementation (closed session) Revised Level 1 event tree logic (closed session) Level 1/2 interface and containment event tree (closed session) ISLOCA – introduction of issue and SSHAC approach to expert elicitation (closed session) Release termination criteria (closed session) |
|
| 02/18/2015 | MACCS analysis overview EP modeling Level 1 internal event and flood peer review findings (closed session) Level 1 event tree philosophy and logic (closed session) LOOP/SBO and consequential LOOP modeling (closed session) Safe-and-stable end-state (closed session) |
|
| 03/01/2016 | ISLOCA expert elicitation process (open session) and results (closed session) | |
| 12/13/2016 | Integrated site risk approach (open session) and pilot applications (closed session) LPSD Level 1 PRA for internal events (closed session) Dry cask storage PRA (closed session) |
|
| 05/02/2017 | Draft report – format and contents Initial Level 1 Fire PRA (closed session) Initial Level 1 Seismic PRA (closed session) |
|
| 10/04/2017 |
NUREG, Part 1 |
|
| 11/16/2017 | Continuation of Subcommittee meeting from October 4, 2017 (closed session) |
|
Page Last Reviewed/Updated Tuesday, September 08, 2026
Page Last Reviewed/Updated Tuesday, September 08, 2026