DESCRIPTION The loss of all feedwater event at Davis-Besse on June 9, 1985, resulted in the formation of an NRC project team to investigate the event. The team's findings were published in NUREG-1154 [1] and were subsequently reviewed by DL/NRR. As a …
1
DESCRIPTION Historical Background This issue was identified [1] by NRR as a result of concern for the potential loss of the RHR system under a harsh containment environment. The RHR system is normally located outside the containment and is not required to …
1
DESCRIPTION Historical Background Large-break loss-of-coolant accidents (LBLOCA) with consequential steam generator tube ruptures (SGTR) was identified as a GSI in a DRPS/RES memorandum [1] on April 28, 1987. The issue surfaced as a result of the proposed …
1
DESCRIPTION Historical Background This issue was identified as an alternative approach to the Finding 15 recommendation [1] discussed in Issue 125.I.5, "Safety Systems Tested in All Conditions Required by DBA," which states that "[t]horough integrated …
1
DESCRIPTION Historical Background This issue was identified [1] by NRR following the issuance of NRC Information Notice (IN) 93-17 [2] which was based in part on a deficiency in the Surry Power Station emergency diesel generator (DG) loading. This …
1
DESCRIPTION On August 24, 1992, Hurricane Andrew hit south Florida and caused extensive onsite and offsite damage at Turkey Point. Following this hurricane which was classified Category 4, an NRC/industry team was organized to: (1) review the damage …
1
DESCRIPTION Historical Background This issue was identified [1] following an NRR request for reconsideration of the safety priority ranking (DROP) of GSI-22, "Inadvertent Boron Dilution Events," based on new information on high burn-up fuel and new …
1
DESCRIPTION NRC regulatory requirements include the estimation of individual offsite dose from the design basis LOCA. The fission product source term in TID-14844 [1] which is referenced by the regulations, has historically been used for this application. …
1
EXECUTIVE SUMMARY The issue of potential blockage in the containment sumps was first identified in Unresolved Safety Issue (USI) A-43, "Containment Emergency Sump Performance." It identified a concern for the availability of adequate recirculation cooling …
1
DESCRIPTION Historical Background This issue was identified [1] , [2] by a Region III inspector and addressed the possible failure of low pressure emergency core cooling systems due to unanticipated, large quantities of entrained gas in the suction piping …
1
DESCRIPTION Historical Background This issue was identified [1] by NRR following an allegation that was submitted to the NRC in March 2006 that described a scenario in which a SBLOCA event in a PWR has progressed to the sump recirculation mode of core …
1
This task, outlined in Chapter 1 of NUREG-1251, [1] called for the staff to review the administrative controls over plant operations in the U.S. to determine if adequate controls are in place to maintain plant conditions within the safe operating …
1
A number of facts about the Chernobyl accident have some bearing on emergency planning and preparedness around U.S. commercial nuclear power plants. This task, outlined in Chapter 4 of NUREG-1251, [1] called for the staff to examine the implications of …