DESCRIPTION

NRC regulatory requirements include the estimation of individual offsite dose from the design basis LOCA. The fission product source term in TID-14844[1]which is referenced by the regulations, has historically been used for this application. As an update to the source term in TID-14844,[2]the NRC developed NUREG-1465,[3]

which provides a more realistic source term based on two decades of severe accident research; its use in offsite dose analysis provides safety and cost benefits. Accordingly, the NRC issued a new regulation, 10 CFR 50.67, allowing licensees to implement an alternative source term. Together with the issuance of 10 CFR 50.67, the NRC issued a regulatory guide which states that one acceptable alternative source term (AST) is the gap and in-

vessel releases described in NUREG-1465.[4]In the implementation of NUREG-1465[5]for estimating offsite

dose, the issue arose[6]as to whether any additional requirements were needed with respect to estimating doses for equipment exposed to sump water.

NRC regulatory requirements also include the environmental qualification of equipment for the duration that it is needed to perform its safety function. This includes qualification for radiation, temperature, pressure, and

humidity. Regulatory Guide 1.8991 states that it is acceptable to use the TID-14844[7]source term for this application. Regulatory Guide 1.89 also states that, for equipment that must be qualified for more than thirty days, a source term that incorporates considerable quantities of cesium, as suggested by the accident at TMI-2,

may produce doses greater than those estimated by TID-14844,[8]which includes a 1% release of cesium. The gap and in-vessel releases described in NUREG-1465[9]include a 30% release of cesium.

The SNL report Evaluation of Radiological Consequences of Design Basis Accidents at Operating Reactors Using the Revised Source Term, dated September 28, 1998, showed that, for equipment exposed to the

containment atmosphere, the TID-14844[10]source term and the gap and in-vessel releases in the AST produced similar integrated doses. This report also showed that, for equipment exposed to sump water, the integrated doses calculated with the AST exceeded those calculated with TID-14844,[11]after 42 days for a PWR and 145 days for a BWR, because of the 30% vs. 1% release of cesium.

CONCLUSION

The staff concluded that there was no clear basis for backfitting the requirement to modify the design basis for equipment qualification to adopt the AST. There would be no discernible risk reduction associated with such a requirement. Licensees should be aware, however, that a more realistic source term would potentially involve a larger dose for equipment exposed to sump water for long periods of time. Longer term equipment operability issues associated with severe fuel damage accidents, (with which the AST is associated) could also be addressed under accident management or plant recovery actions as necessary. Thus, the issue was

DROPPED from further pursuit.[12]

 

 

[1] TID-14844, "Calculation of Distance Factors for Power and Test Reactor Sites," U.S. Atomic Energy Commission, March 23, 1962. [8202010067]

[2] TID-14844, "Calculation of Distance Factors for Power and Test Reactor Sites," U.S. Atomic Energy Commission, March 23, 1962. [8202010067]

[6] Memorandum for A. Thadani from B. Sheron, "Proposed Generic Safety Issue"The Potential Impact of Postulated Cesium Concentration on Equipment Qualification in the Containment Sump," December 16, 1999. [ML993610109]

[7] TID-14844, "Calculation of Distance Factors for Power and Test Reactor Sites," U.S. Atomic Energy Commission, March 23, 1962. [8202010067]

[8] TID-14844, "Calculation of Distance Factors for Power and Test Reactor Sites," U.S. Atomic Energy Commission, March 23, 1962. [8202010067]

[10] TID-14844, "Calculation of Distance Factors for Power and Test Reactor Sites," U.S. Atomic Energy Commission, March 23, 1962. [8202010067]

[11] TID-14844, "Calculation of Distance Factors for Power and Test Reactor Sites," U.S. Atomic Energy Commission, March 23, 1962. [8202010067]

[12] Memorandum for A. Thadani from J. Rosenthal, "Initial Screening of Candidate Generic Issue 187, 'The Potential Impact of Postulated Cesium Concentration on Equipment Qualification in the Containment Sump,'" April 30, 2001. [ML011210348]

Page Last Reviewed/Updated Tuesday, March 24, 2026