The objective of this task was to enhance public safety and reduce individual and societal risk by developing and implementing a phased program to include, in safety reviews, consideration of core degradation and melting beyond the design basis. ITEM …
TASK III.D.1: RADIATION SOURCE CONTROL The objective of this task is to perform evaluations to establish additional design features that should be included in the rulemaking proceeding of Item II.B.8. The purpose of these evaluations is to identify design …
The objective of this task was to improve public radiation protection in the event of a nuclear power plant accident by improving (1) radioactive effluent monitoring, (2) the dose analysis for accidental releases of radioiodine, tritium, and carbon-14, …
The objective of this task is to improve nuclear power plant worker radiation protection to allow workers to take effective action to control the course and consequences of an accident, as well as to keep exposures as low as reasonably achievable (ALARA) …
The objective of this task is to respond to the President's request for NRC participation in the Radiation Policy Council. ITEM IV.H.1: NRC PARTICIPATION IN THE RADIATION POLICY COUNCIL DESCRIPTION The Radiation Policy Council, a policy coordinating body …
DESCRIPTION The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling systems, RHR systems, containment spray, service water, feedwater, and steam lines. The …
DESCRIPTION Historical Background Operation of a LWR results in slow corrosion of the interior metal surfaces of the primary coolant system. The resulting corrosion products circulate through the reactor core and are activated by neutron flux from the …
DESCRIPTION At the time this issue was identified in NUREG-0371, [1] compliance with NEPA required that alternatives to a proposed Federal action be considered, and that required alternatives be balanced against the base case in terms of their associated …
DESCRIPTION This NUREG-0471 [1] task will develop more reliable models and associated computer capability than currently available to the staff for assessing the radiological consequences of accidents that could result in the releases of radioactivity …
DESCRIPTION This NUREG-0471 [1] task involves the maintenance and improvement of calculational capabilities for assessing doses to individuals from radiation and radioactive effluents from normal operation and from radioactive releases from postulated …
DESCRIPTION Practice in health impact assessments at the time of identification of this issue was to convert radiation exposure estimates into estimates of health effects, such as cancer deaths, illness, and life shortening. However, the models that were …
DESCRIPTION This issue was raised in an AEOD memorandum [1] to NRR and OIE in October 1980 and addressed the problem of flow blockage by Asiatic clams (Corbicula) in redundant safety-related cooling water systems at Arkansas Nuclear One. CONCLUSION This …
DESCRIPTION Historical Background On June 19, 1981, AEOD issued a preliminary report [1] on the incident at Calvert Cliffs Unit 1 in which the plant lost both redundant trains of service water when the service water system became air-bound as a result of …
DESCRIPTION While operating at 100% power on March 10, 1980, San Onofre Unit 1 experienced a complete loss of the salt water cooling system. The event involved an unlikely triple failure and desiccant contamination of the instrument air system was found …
DESCRIPTION Historical Background This issue was raised in a DL memorandum [1] to DST in March 1982 and addressed the subject of service water system (SWS) fouling at operating plants primarily by aquatic bivalves. Prior to and following this memorandum, …
DESCRIPTION This issue was raised in an AEOD memorandum [1] to NRR in May 1982 and addressed the problem of flow blockage by blue mussels (Mytilus Edilus) in the reactor building closed cooling water system at Pilgrim. CONCLUSION This issue has been …
DESCRIPTION Historical Background On November 11, 1981, the DAILY REPORT-REGION I carried a "prompt report" from Calvert Cliffs Units 1 and 2 indicating the licensee had been notified that the water tight integrity of the service water pump rooms in both …
DESCRIPTION Historical Background Over the past several years, the NRC staff has noted an unacceptably large number of overexposures and uncontrolled exposures associated with pressurized water reactor cavity entries while incore detectors were withdrawn. …
DESCRIPTION Historical Background This issue was identified [1] when the staff found the Byron Unit 1 vulnerable to core-melt sequences in the absence of the availability of Byron Unit 2 which was not yet operational. Because of the licensing status of …
DESCRIPTION Historical Background The reliability of essential service water (ESW) systems and related problems have been an ongoing staff concern which has been documented in NUREG/CR-2797, [1] IE Bulletins 80-24 [2] and 81-03, [3] Generic Letter No. …
DESCRIPTION The TMI-2 Safety Advisory Board was established to provide the licensee, General Public Utilities Nuclear Corporation, with a qualified, independent appraisal of the cleanup of TMI-2, with particular emphasis on the assurance of public and …
DESCRIPTION NRC regulatory requirements include the estimation of individual offsite dose from the design basis LOCA. The fission product source term in TID-14844 [1] which is referenced by the regulations, has historically been used for this application. …
DESCRIPTION Historical Background This GI was proposed [1] in response to a concern raised by the ACRS in its May 21, 2004, report on the resolution of certain NUREG-1740 [2] items. The ACRS recommended that the staff develop a mechanistic understanding …

Page Last Reviewed/Updated 3/1/2026

Disclaimer: Some of the formatting in NUREG-0933 may not be correct. We are currently working on fixing the formatting.