DESCRIPTION Historical Background This issue is identified in Appendix D of NUREG-0572 [1] and is one of the key observations made after the ACRS requested its members and consultants to make comprehensive reviews of all Licensee Event Reports (LERs) …
1
DESCRIPTION Historical Background Over the past several years, the NRC staff has noted an unacceptably large number of overexposures and uncontrolled exposures associated with pressurized water reactor cavity entries while incore detectors were withdrawn. …
1
DESCRIPTION The issue, as originally proposed, [1] addressed the concern for fission product removal by the containment sprays and suppression pools in PWRs and BWRs, respectively; however, it was expanded to include PWR plants that use ice condenser …
1
DESCRIPTION The TMI-2 Safety Advisory Board was established to provide the licensee, General Public Utilities Nuclear Corporation, with a qualified, independent appraisal of the cleanup of TMI-2, with particular emphasis on the assurance of public and …
1
DESCRIPTION Historical Background This issue was identified [1] by NRR as a result of a diagnostic evaluation team inspection of the SWS at Zion, a multiplant site. The inspection identified the potential for some additional shared systems to have an …
1
DESCRIPTION NRC regulatory requirements include the estimation of individual offsite dose from the design basis LOCA. The fission product source term in TID-14844 [1] which is referenced by the regulations, has historically been used for this application. …
1
DESCRIPTION Historical Background This GI was proposed [1] in response to a concern raised by the ACRS in its May 21, 2004, report on the resolution of certain NUREG-1740 [2] items. The ACRS recommended that the staff develop a mechanistic understanding …
1