DESCRIPTION Historical Background The NRC post-TMI-2 accident shift staffing policy was codified through the issuance of 10 CFR 50.54(m) which specified minimum requirements for licensed operators at nuclear power reactor sites but not for non-licensed …
1
DESCRIPTION Historical Background The Rosemount Transmitter Review Group (RTRG) was established [1] to perform an assessment of the actions taken to address Rosemount transmitter oil-loss concerns. This assessment included an evaluation of the adequacy of …
1
DESCRIPTION Historical Background At 6:53 a.m. on February 7, 1993, an intruder drove into the TMI site owner-controlled area, through a gate into the protected area of Unit 1, and crashed through a roll-up door on the turbine building. TMI security …
1
DESCRIPTION On August 24, 1992, Hurricane Andrew hit south Florida and caused extensive onsite and offsite damage at Turkey Point. Following this hurricane which was classified Category 4, an NRC/industry team was organized to: (1) review the damage …
1
DESCRIPTION Core design is a fundamental component of plant safety because maintaining fuel integrity is the first principal safety barrier (i.e., fuel cladding, reactor coolant system boundary, or the containment) against serious radioactive releases. …
1
DESCRIPTION The NRC requires that a licensee operate its facility in compliance with the NRC's regulations and the specific facility's license. When a licensee fails to comply with the conditions of its license or the NRC's regulations, the staff will …
1
DESCRIPTION In February 1993, The U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) completed a reassessment of the reactor fire protection review and inspection programs, in response to programmatic concerns raised …
1
DESCRIPTION Historical Background A generic BWR power uprate program was created to provide a consistent means for individual licensees to recover additional generating capacity beyond their existing licensed limit. In 1990, GE submitted licensing topical …
1
DESCRIPTION The objective of this task was to respond to the Regulatory Review Group (RRG) Item #55. The RRG recommendations were to provide quicker review of core reload codes and to revise existing TS to permit changes, in accordance with approved core …
1
DESCRIPTION In 1973, Congress passed the Endangered Species Act for the protection of endangered or threatened species. In responding to a Commission memorandum dated July 30, 1991, [1] concerning efforts of the Commission, applicants, and licensees to …
1
DESCRIPTION Historical Background This issue was identified [1] following an NRR request for reconsideration of the safety priority ranking (DROP) of GSI-22, "Inadvertent Boron Dilution Events," based on new information on high burn-up fuel and new …
1
DESCRIPTION Historical Background The Office of Nuclear Reactor Regulation (NRR) identified this issue in April 1999, [1] when the concern was raised that licensees operating within the regulatory guidelines of Generic Letter (GL) 85-11, Completion of …
1
DESCRIPTION NRC regulatory requirements include the estimation of individual offsite dose from the design basis LOCA. The fission product source term in TID-14844 [1] which is referenced by the regulations, has historically been used for this application. …
1
DESCRIPTION Historical Background This issue was identified when it was believed [1] that the validity of steam generator (SG) tube leak and rupture analyses could be affected by resonance vibrations in steam generator tubes during steam line break …
1
DESCRIPTION Historical Background This generic issue was proposed [1] in response to SECY-00-198 [2] which explored means of risk informing 10 CFR 50.44. As a part of this effort, the paper recommended that safety enhancements that have the potential to …
1
DESCRIPTION The risk of failure from fatigue of various reactor coolant system components was studied under Issue 78 and later integrated into the NRR Fatigue Action Plan which was completed and documented in SECY-95-245. [1] The staff concluded that the …
1
EXECUTIVE SUMMARY The issue of potential blockage in the containment sumps was first identified in Unresolved Safety Issue (USI) A-43, "Containment Emergency Sump Performance." It identified a concern for the availability of adequate recirculation cooling …
1
DESCRIPTION Historical Background This issue was raised [1] by NRR and addresses the adequacy of the calculations, testing, and acceptance criteria related to the creation of a vacuum in the reactor building of a BWR, following an engineered safeguards …
1
DESCRIPTION Historical Background This issue was identified [1] , [2] by a Region III inspector and addressed the possible failure of low pressure emergency core cooling systems due to unanticipated, large quantities of entrained gas in the suction piping …
1
DESCRIPTION Historical Background Beginning in the early-1980s, the NRC sponsored the development of a Probabilistic Seismic Hazard Analysis (PSHA) methodology by LLNL. For the purpose of conducting a systematic evaluation of the licensing criteria for …
1
DESCRIPTION Historical Background The issue of potential hazards from combustible gases was raised [1] after two events involving hydrogen combustion occurred within 2 months in late-2001 at two foreign BWRs. Both these events involved sudden rupture of …
1
DESCRIPTION Historical Background This issue was raised [1] , [2] by an NMSS staff member whose concern arose from the observation that spent fuel pool racks using Boral for neutron absorption had experienced some problems with swelling and degradation of …
1
DESCRIPTION Historical Background This GI was proposed [1] in response to a concern raised by the ACRS in its May 21, 2004, report on the resolution of certain NUREG-1740 [2] items. The ACRS recommended that the staff develop a mechanistic understanding …
1
DESCRIPTION Historical Background This issue was initiated [1] in response to a recommendation in the screening analysis of Generic Issue (A) I-195, "Potential Hydrogen Combustion in BWR Piping." GI-195 investigated the potential safety …
1
DESCRIPTION On May 26, 2005, the Office of Nuclear Reactor Regulation (NRR), Division of Engineering, recommended that issues related to closed Generic Issue (GI)-194, "Implications of Updated Probabilistic Seismic Hazard Estimates," dated September 23, …
1