Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Figure 5.11 Contaminant Residence Time (flushing rate) and Surface Area-Volume Ratios

Contaminant residence time (flushing rate) and surface area-volume ratios for water bodies within an 80-km (50-mile) radius of selected nuclear power plants

Figure 5.11 Contaminant residence time (flushing rate) and surface area-volume ratios for water bodies within an 80-km (50-mile) radius of selected nuclear power plants

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021