Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Assessment of RELAP5/MOD2 Computer Code Against the Net Load Trip Test Data From Yong–Gwang, Unit 2 (NUREG/IA-0092)

On this page:

Download complete document

Publication Information

Date Published: June 1993

Prepared by:
Namsung Arne, Sungjae Cho/KEPC
Sang Hoon Lee/KINS

Korea Electric Power Co.
17-15, Yongjeon-Dong, Dong-Gu
Taejeon, Korea

Korea Institute of Nuclear Safety
P.O. Box 16, Daeduck Danji
Taejeon, Korea

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Thermal-Hydraulic Code Assessment
and Application Program (ICAP)

Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

The results of the RELAP5/MOD2 computer code simulation for the 100 % Net Load Trip Test in Yong-Gwang Unit 2 are analyzed here and compared with the plant operation data. The control systems for the control rod, feedwater, steam generator level, steam dump, pressurizer level and pressure are modeled to be functioned automatically until the power level decreases below 30 % nuclear power. A sensitivity study on control rod worth was carried out and it was found that variable rod worth should be used to achieve good prediction of neutron power. The results obtained from RELAP5/MOD2 simulation agree well with the plant operating data and it can be concluded that this code has the capability in analyzing the transient of this type in a best estimate means.

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021