Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
RIS-06-27 |
Availability of NRC 313A Series of Forms and Guidance for their Completion |
S1 |
06/27/2007 |
-- |
-- |
12/13/2006 |
-- |
RIS-06-26 |
Training and Experience and Grandfather Provisions for Authorized Medical Physicists under 10 CFE Part 35 |
-- |
12/07/2006 |
-- |
RIS-06-25 |
Requirements for the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 and 32.51a |
-- |
12/07/2006 |
-- |
RIS-06-24 |
Revised Review and Transmittal Process for Accident Sequence Precursor Analyses |
-- |
12/06/2006 |
-- |
RIS-06-23 |
Post-tornado Operability of Ventilating and Air-conditioning Systems Housed in Emergency Diesel Generator Rooms |
-- |
12/06/2006 |
-- |
RIS-06-22 |
Lessons Learned from Recent 10 CFR Part 72 Dry Cask Storage Campaign |
-- |
11/15/2006 |
-- |
RIS-06-21 |
Improving Response Capabilities Through the Use of an Incident Response Electronic Library |
-- |
09/28/2006 |
-- |
RIS-06-20 |
Guidance for Receiving Enforcement Discretion When Concentrating Uranium at Community Water Systems |
1 |
12/14/2011 |
-- |
W |
Superseded by RIS 2006-20, Rev. 1 |
02/17 |
-- |
09/14/2006 |
-- |
RIS-06-19 |
Availability of Guidance on Radioactive Seed Localization |
-- |
09/14/2006 |
-- |
RIS-06-18 |
Requesting Exemption from the Public Dose Limits for Certain Caregivers of Hospital Patients |
-- |
08/31/2006 |
-- |
RIS-06-17 |
NRC Staff Position on the Requirements of 10 CFR 50.36, "Technical Specifications," Regarding Limiting Safety System Settings During Periodic Testing and Calibration of Instrument Channels |
-- |
08/24/2006 |
-- |
RIS-06-16 |
Transfer of the Management Oversight of Certain NRC Region I Licensees in Mississippi to the NRC Region IV Office |
-- |
08/15/2006 |
-- |
RIS-06-15 |
Preparation and Scheduling of Operator Licensing Examinations |
W |
81 FR 31969
05/20/2016 |
-- |
|
08/14/2006 |
RIS-06-14 |
Enforcement Discretion for Facility Changes Under 10 CFR 70.72(c)(2) |
-- |
09/22/2006 |
-- |
RIS-06-13 |
Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture |
-- |
07/31/2006 |
-- |
RIS-06-12 |
Endorsement of Nuclear Energy Institute Guidance "Enhancements to Emergency Preparedness Programs for Hostile Action" |
-- |
07/19/2006 |
-- |
RIS-06-11 |
Requesting Quality Assurance Program Approval Renewals Online By Electronic Information Exchange |
-- |
07/20/2006 |
-- |
RIS-06-10 |
Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions |
-- |
06/30/2006 |
-- |
RIS-06-09 |
NRC's Procedures for Review of Decommissioning Funding Assurance Reports |
-- |
06/21/2006 |
-- |
RIS-06-08 |
Publicly Available Cover Letters for Security-Related Inspection Report |
-- |
06/12/2006 |
-- |
RIS-06-07 |
Changes to the Safety System Unavailability Performance Indicators |
-- |
06/12/2006 |
-- |
RIS-06-06 |
New Reactor Standardization Needed to Support the Design-Centered Licensing Review Approach |
-- |
05/31/2006 |
-- |
RIS-06-05 |
Withdrawal of Transportation Safeguards Advisories SA-01-01, Rev. 1 and SA-03-02 |
-- |
04/20/2006 |
-- |
RIS-06-04 |
Experience With Implementation of Alternative Source Terms |
-- |
03/07/2006 |
-- |
RIS-06-03 |
Guidance On Requesting an Exemption From Biennial Emergency Prepareness Exercise Requirements |
-- |
02/24/2006 |
-- |
RIS-06-02 |
Good Practices For Licensee Performance During The Emergency Prepareness Conponent of Force-On-Force Exercises |
-- |
02/23/2006 |
-- |
RIS-06-01 |
Expiration Date for NRC-Approved Spent Fuel Transportation Routes |
-- |
01/24/2006 |
-- |