Information Notice No. 79-10 Nonconforming Pipe Support Struts
IN79010 April 11, 1979 MEMORANDUM FOR: B. H. Grier, Director, Region I J. P. O'Reilly, Director, Region II J. G. Keppler, Director, Region III K. V. Seyfrit, Director, Region IV R. H. Engelken, Director, Region V FROM: Harold D. Thornburg, Director, RCI:IE SUBJECT: Information Notice No. 79-10 NONCONFORMING PIPE SUPPORT STRUTS The subject Information Notice is transmitted for issuance on April 16, 1979. The Information Notice should be issued to all power reactor facilities with a construction permit. Also enclosed is a draft copy of the transmittal letter for this purpose. Harold D. Thornburg, Director Division of Reactor Construction Inspection Office of Inspection and Enforcement Enclosure: 1. IE Information Notice No. 79-10 2. Draft Transmittal Letter CONTACT: W. Laudan, IE 49-27551 . (Draft letter to all power reactor facilities with a construction permit) Information Notice No. 79-10 Addressee: This Information Notice is provided as an early notification of a possibly significant matter. It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time. If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions. If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office. Signature (Regional Director) Enclosure: Information Notice No. No. 79-10 . UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 April 16, 1979 Information Notice No. 79-10 NONCONFORMING PIPE SUPPORT STRUTS Description of Circumstances: Bergen-Paterson Pipesupport Corporation informed the NRC that a limited quantity of its Part 2000 Rigid Rod Strut do not meet the published design criteria. Subsequent plant inspection by the NRC indicated that no nonconforming Part 2000 Rigid Rod Struts are installed in operating units. However, the following construction sites were identified as receiving nonconforming struts: Summer No. 1 Unit Shoreham Grand Gulf No. 1 and 2 Units Wolf Creek No. 1 Unit Callaway No. 1 Unit Waterford No. 3 Unit St. Lucie No. 2 Unit Washington Nuclear No. 2 Unit Zimmer No. 1 Unit The actual load rating of Part 2000 Rigid Rod Struts varies with the material used for rods in the assembly. At various times this rod was made from SA-36, SA-306, grade 60 and A-108 grade 1018 materials. Re-analysis indicates that the use of A-108 grade 1018 produces a product meeting all published criteria for all sizes; however, the use of either SA-36 or SA-306, grade 60 materials produces an acceptable material only for sizes 1.5 and 3 but not for sizes 10 and 20. All construction permit holders should consider conducting a review to determine if Bergen-Paterson Pipesupport Corporation Part 2000 Rigid Rod Struts of the sizes 10 and 20 are being used at their construction sites. If so, determine if those in stock and installed meet the required design criteria. 1 of 2 . Information Notice No. 79-10 April 16, 1979 This information is provided as a notification of a possibly significant matter. It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time. If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions. If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office. Enclosure: List of IE Information Notices Issued in 1979 2 of 2
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021