Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Power Reactor Status Report for November 11, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100 *
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 0 2023-10-20 Refueling Outage
Nine Mile Point 1 100
Nine Mile Point 2 98 Reduced Power For Moisture Separator Reheater Efficiency
Peach Bottom 2 80 Turbine testing *
Peach Bottom 3 100
Salem 1 0 2023-10-08 Refueling Outage *
Salem 2 100
Seabrook 1 100 *
Susquehanna 1 0 2023-11-10 200 MVAR Restriction EN 56846 1
Susquehanna 2 100 250 MVAR Restriction

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 72 Reduced Power For Rod Pattern Adjustment *
Brunswick 1 52 Reduced Power For Maintenance *
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 2023-10-09 Refueling Outage
Harris 1 100
Hatch 1 99 Core flow limited
Hatch 2 100 *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 0 2023-10-28 Refueling Outage
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 2 Maintenance Outage *
Vogtle 1 100
Vogtle 2 95 Heater Drain Pump Trip
Vogtle 3 100
Vogtle 4 0 Prestartup testing on hold for RCP replacement
Watts Bar 1 100
Watts Bar 2 0 2023-11-04 Refueling Outage

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 0 2023-10-14 Refueling Outage *
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 0 2023-10-30 Refueling Outage
Dresden 3 100
Fermi 2 90 Reduced Power For Rod Pattern Adjustment *
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 2023-10-20 EN 56803
Prairie Island 2 0 2023-10-07 Refueling Outage
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 .
Columbia Generating Station 100
Comanche Peak 1 0 2023-10-16 Refueling Outage *
Comanche Peak 2 100
Cooper 100 .
Diablo Canyon 1 0 2023-10-01 Refueling Outage *
Diablo Canyon 2 45 Holding power for tunnel cleaning *
Grand Gulf 1 100
Palo Verde 1 0 2023-10-07 Refueling Outage *
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 0 2023-10-29 Planned Outage
South Texas 1 100
South Texas 2 100
Waterford 3 0 2023-10-14 Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.