Power Reactor Status Report for September 24, 2023
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in Report (*) | Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | High System Voltage Action | * | ||
| Beaver Valley 2 | 100 | High System Voltage Action | * | ||
| Calvert Cliffs 1 | 100 | High System Voltage Action | * | ||
| Calvert Cliffs 2 | 100 | High System Voltage Action | * | ||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 80 | Reduced Power For Maintenance | * | ||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 97 | Reduced Power For Maintenance | |||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 85 | Coastdown To Refueling Outage | |||
| Salem 1 | 88 | Coastdown To Refueling Outage | * | ||
| Salem 2 | 100 |