Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Power Reactor Status Report for April 12, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2023-04-09 Refueling Outage
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 2023-04-10 Refueling Outage
Hope Creek 1 100
Limerick 1 100
Limerick 2 85 Coastdown To Refueling Outage *
Millstone 2 0 2023-04-07 Refueling Outage
Millstone 3 100
Nine Mile Point 1 0 2023-03-13 Refueling Outage
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 0 2023-04-01 Refueling Outage
Seabrook 1 0 2023-04-01 Refueling Outage
Susquehanna 1 100
Susquehanna 2 0 2023-03-20 Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 96 Reduced Power For Maintenance *
Brunswick 1 100
Brunswick 2 100
Catawba 1 85 Coastdown To Refueling Outage
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 93 Increasing Power *
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2023-03-18 Refueling Outage *
Summer 0 2023-04-06 See EN 56453
Surry 1 100
Surry 2 89 Coastdown To Refueling Outage
Turkey Point 3 0 2023-04-08 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0 2023-04-10 See EN56460
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 87 Coastdown To Refueling Outage *
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 75 Coastdown To Refueling Outage
Perry 1 0 2023-02-26 Starting up *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 77 Reduced Power for Economic Dispatch (Flexible Power Operations) *
Prairie Island 2 100
Quad Cities 1 0 2023-03-27 Refueling Outage
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 80 Coastdown To Refueling Outage
Callaway 100
Columbia Generating Station 95 Coastdown To Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 97 Reduced Power For Maintenance
Palo Verde 1 0 2023-04-08 EN 56459
Palo Verde 2 0 2023-04-08 Refueling Outage *
Palo Verde 3 100
River Bend Station 1 0 2023-02-11 Refueling Outage
South Texas 1 0 2023-03-18 Refueling Outage
South Texas 2 100
Waterford 3 100
Wolf Creek 1 70 Reduced Power for Economic Dispatch (Flexible Power Operations) *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.