Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for April 10, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2023-04-09 Refueling Outage *
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 2023-04-10 Coastdown To Refueling Outage *
Hope Creek 1 100
Limerick 1 100
Limerick 2 86 Coastdown To Refueling Outage *
Millstone 2 0 2023-04-07 Refueling Outage
Millstone 3 100
Nine Mile Point 1 0 2023-03-13 Refueling Outage
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 0 2023-04-01 Refueling Outage
Seabrook 1 0 2023-04-01 Refueling Outage
Susquehanna 1 100
Susquehanna 2 0 2023-03-20 Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 98 Reduced Power For Maintenance *
Brunswick 1 100
Brunswick 2 100
Catawba 1 86 Coastdown To Refueling Outage
Catawba 2 100
Farley 1 100
Farley 2 99 Decreasing Power for Turbine Valve Testing *
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 36 Generator Breaker Maintenance *
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2023-03-18 Refueling Outage
Summer 0 2023-04-06 See EN 56453
Surry 1 100
Surry 2 90 Coastdown To Refueling Outage *
Turkey Point 3 0 2023-04-08 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0 2023-04-10 Reactor Trip. See EN56460 * 1
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 89 Coastdown To Refueling Outage *
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100 *
Monticello 77 Coastdown To Refueling Outage
Perry 1 0 2023-02-26 Refueling Outage
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100 *
Prairie Island 2 100
Quad Cities 1 0 2023-03-27 Refueling Outage
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 81 Coastdown To Refueling Outage *
Callaway 100
Columbia Generating Station 95 Coastdown To Refueling Outage *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 98 Reduced Power For Maintenance *
Palo Verde 1 0 2023-04-08 EN 56459 *
Palo Verde 2 0 2023-04-08 Refueling Outage
Palo Verde 3 100
River Bend Station 1 0 2023-02-11 Refueling Outage
South Texas 1 0 2023-03-18 Refueling Outage
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.