Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for September 14, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2020-09-13 Headed to Mode - 3 (Hot Shutdown) Refueling Outage *
Ginna 100
Hope Creek 1 100
Indian Point 2 0 2020-04-30 Reactor defueled for permanent shutdown
Indian Point 3 100
Limerick 1 100 *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 89 Coastdown To Refueling Outage
Peach Bottom 3 100 *
Salem 1 100
Salem 2 100
Seabrook 1 100 Contingency down power to 800 MWE due to switchyard work
Susquehanna 1 100
Susquehanna 2 97 Increasing Power *
Three Mile Island 1 0 2019-09-20 Reactor defueled for permanent shutdown

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 92 Coastdown To Refueling Outage
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100 *
Catawba 1 100
Catawba 2 100
Farley 1 100 Conservative Operations warning due to Hurricane Sally *
Farley 2 100 Conservative Operations warning due to Hurricane Sally *
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 99 Coastdown To Refueling Outage *
McGuire 2 100
North Anna 1 100
North Anna 2 0 2020-09-12 Refueling Outage *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 86 Holding power due to equipment malfunction
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 95 Increasing power. *
Watts Bar 1 100 *
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 96 Coastdown To Refueling Outage
Clinton 99 100% Electrical Capability *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 96 Coastdown To Refueling Outage
Duane Arnold 0 2020-08-10 See EN 54826
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 0 2020-08-30 Refueling Outage
Perry 1 100 *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 89 Coastdown To Refueling Outage
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 87 Coastdown To Refueling Outage *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 83 EHC Fluid Leak *
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100 Conservative Operations.
South Texas 1 100
South Texas 2 100
Waterford 3 89 Coastdown To Refueling Outage Conservative operations. *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.