Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Power Reactor Status Report for August 29, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 90 Coastdown To Refueling Outage
Ginna 100
Hope Creek 1 79 Reduced Power For Rod Pattern Adjustment *
Indian Point 2 0 2020-04-30 Reactor defueled for permanent shutdown
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 95 Coastdown To Refueling Outage *
Peach Bottom 3 100
Salem 1 100
Salem 2 59 Bus Duct Cooling Maintenance *
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 0 2019-09-20 Reactor defueled for permanent shutdown

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 94 Coastdown To Refueling Outage
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 90 Reduced Power For Rod Pattern Adjustment Increasing Power *
Brunswick 2 100 *
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 97 Coastdown To Refueling Outage *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 87 Circ Water pump maintenance
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 0 2020-08-16 Refueling Outage
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 98 full electrical output
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 0 2020-08-10 See EN 54826
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 88 Coastdown To Refueling Outage *
Perry 1 96 Due to ambient conditions. *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 2020-08-26 See EN 54859
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 93 Coastdown To Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 65 Increasing Power *
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 65 Conservative Operations Reduced Power For Rod Pattern Adjustment *
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.