Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for May 31, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 High System Voltage Action *
Beaver Valley 2 100 High System Voltage Action *
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 0 2020-04-30 Reactor defueled for permanent shutdown
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2020-04-23 Refueling Outage
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 0 2020-05-28 See event #54731 *
Susquehanna 1 98 Minimum of 100 MVar output Total MW Net output limit due to transmission limits *
Susquehanna 2 99 Minimum of 100 MVar output Total MW Net output limit due to transmission limits *
Three Mile Island 1 0 2019-09-20 Reactor defueled for permanent shutdown

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 87 Reduced power to troubleshoot condenser issue
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 88 Increasing Power *
Catawba 1 0 2020-05-01 Refueling Outage
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 83 Reducing Power to 70% For Planned Maintenance *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 99 100% Electrical Capability *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 0 2020-05-02 Refueling Outage
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100 *
Watts Bar 1 0 2020-05-08 Refueling Outage
Watts Bar 2 0 2020-05-15 Forced Outage

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 75 Reduced Power For Rod Pattern Adjustment *
D.C. Cook 1 100 High System Voltage Action *
D.C. Cook 2 100 High System Voltage Action *
Davis-Besse 100 High System Voltage Action *
Dresden 2 100
Dresden 3 100
Duane Arnold 70 Reduced power for tech spec limit for dry well air temp
Fermi 2 0 2020-03-21 Refueling Outage
LaSalle 1 100
LaSalle 2 100
Monticello 100 Grid is orange due to relocation of normal dispatch control center.
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100 Grid is orange due to relocation of dispatch control center.
Prairie Island 2 100 Grid is orange due to relocation of dispatch control center.
Quad Cities 1 80 Reduced Power For Rod Pattern Adjustment *
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 67 Dispatch Directed *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100 *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 3 Increasing Power *
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.