The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 22, 2019

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100      
Beaver Valley 2 100      
Calvert Cliffs 1 100      
Calvert Cliffs 2 100      
FitzPatrick 100      
Ginna 100      
Hope Creek 1 100      
Indian Point 2 100      
Indian Point 3 100      
Limerick 1 100      
Limerick 2 0 04/15/2019 REFUELING OUTAGE    
Millstone 2 100      
Millstone 3 0 04/11/2019 REFUELING OUTAGE *  
Nine Mile Point 1 0 04/16/2019 FORCED OUTAGE    
Nine Mile Point 2 100      
Peach Bottom 2 100      
Peach Bottom 3 100      
Pilgrim 1 98   DOWNPOWER DUE TO CONDENSER RESTICTIONS HOLDING POWER    
Salem 1 0 04/12/2019 REFUELING OUTAGE    
Salem 2 100      
Seabrook 1 100   CONTINGENCY FOR LIMIT TO 1100 MWE NET CONTINGENCY FOR LIMIT TO 900 MWE NET    
Susquehanna 1 100      
Susquehanna 2 69   INCREASING POWER *  
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   *  
Browns Ferry 2 84   HOLDING POWER FOR TESTING *  
Browns Ferry 3 100   *  
Brunswick 1 0 04/21/2019 SEE EN#54016 * 1
Brunswick 2 60   REDUCED POWER FOR UNPLANNED MAINTENANCE - ISOLATION OF B FEEDWATER TRAIN    
Catawba 1 100      
Catawba 2 100      
Farley 1 100      
Farley 2 0 04/07/2019 REFUELING OUTAGE *  
Harris 1 100      
Hatch 1 100      
Hatch 2 100      
McGuire 1 51   INCREASING POWER *  
McGuire 2 100      
North Anna 1 100      
North Anna 2 100      
Oconee 1 100      
Oconee 2 100      
Oconee 3 100      
Robinson 2 100      
Saint Lucie 1 100      
Saint Lucie 2 100      
Sequoyah 1 100      
Sequoyah 2 100      
Summer 100      
Surry 1 100      
Surry 2 100      
Turkey Point 3 100      
Turkey Point 4 100      
Vogtle 1 100      
Vogtle 2 100      
Watts Bar 1 100      
Watts Bar 2 0 04/13/2019 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100      
Braidwood 2 100      
Byron 1 100      
Byron 2 0 04/07/2019 REFUELING OUTAGE *  
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/06/2019 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION    
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION    
Dresden 2 100      
Dresden 3 100      
Duane Arnold 10   INCREASING POWER NOT SYNCED TO THE GRID *  
Fermi 2 100      
LaSalle 1 100      
LaSalle 2 100      
Monticello 0 04/13/2019 REFUELING OUTAGE    
Palisades 100      
Perry 1 100      
Point Beach 1 75   HOLDING POWER *  
Point Beach 2 100      
Prairie Island 1 100      
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 93   DOWNPOWER DUE TO LOAD FOLLOWING FOR GRID CONDITIONS *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100      
Arkansas Nuclear 2 100      
Callaway 0 04/01/2019 REFUELING OUTAGE    
Columbia Generating Station 98   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 1 0 04/21/2019 REFUELING OUTAGE *  
Comanche Peak 2 100      
Cooper 100      
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 100   *  
Palo Verde 1 0 04/05/2019 REFUELING OUTAGE    
Palo Verde 2 100      
Palo Verde 3 100      
River Bend Station 1 0 03/29/2019 REFUELING OUTAGE    
South Texas 1 100      
South Texas 2 100      
Waterford 3 100      
Wolf Creek 1 100      

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021