Power Reactor Status Report for June 03, 2018

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100      
Beaver Valley 2 100      
Calvert Cliffs 1 100      
Calvert Cliffs 2 100      
FitzPatrick 100   *  
Ginna 100      
Hope Creek 1 100      
Indian Point 2 100      
Indian Point 3 100   ONE OFFSITE FEEDER OUT OF SERVICE NO WORK ALLOWED ON 13KV FEEDER LINE    
Limerick 1 100      
Limerick 2 100      
Millstone 2 100      
Millstone 3 100      
Nine Mile Point 1 100      
Nine Mile Point 2 100      
Oyster Creek 100      
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION *  
Peach Bottom 3 100      
Pilgrim 1 100      
Salem 1 100      
Salem 2 100      
Seabrook 1 100      
Susquehanna 1 100      
Susquehanna 2 100   *  
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100      
Browns Ferry 2 100      
Browns Ferry 3 92   HOLD FOR POWER UPRATE TESTING *  
Brunswick 1 55   REDUCED POWER DUE TO SECONDARY CHEMISTRY (CONDENSER TUBE LEAK) *  
Brunswick 2 100      
Catawba 1 100      
Catawba 2 100      
Farley 1 100      
Farley 2 100   *  
Harris 1 100      
Hatch 1 100      
Hatch 2 100      
McGuire 1 100      
McGuire 2 100      
North Anna 1 100      
North Anna 2 100      
Oconee 1 100      
Oconee 2 100      
Oconee 3 100      
Robinson 2 100      
Saint Lucie 1 100      
Saint Lucie 2 100      
Sequoyah 1 100      
Sequoyah 2 100      
Summer 100      
Surry 1 100      
Surry 2 100      
Turkey Point 3 100      
Turkey Point 4 100      
Vogtle 1 100      
Vogtle 2 100      
Watts Bar 1 100      
Watts Bar 2 100      

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100      
Braidwood 2 100      
Byron 1 100      
Byron 2 76   HOLDING PER LOAD DISPATCHER REQUEST *  
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100      
D.C. Cook 2 100      
Davis-Besse 100      
Dresden 2 100      
Dresden 3 100   *  
Duane Arnold 100      
Fermi 2 100      
LaSalle 1 100      
LaSalle 2 84   REDUCED POWER FOR PLANNED MAINTENANCE *  
Monticello 100      
Palisades 100      
Perry 1 83   INCREASING POWER TO 100% *  
Point Beach 1 100      
Point Beach 2 100      
Prairie Island 1 100      
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 100      

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 97   HOLDING POWER FOR MAINTENANCE    
Arkansas Nuclear 2 100      
Callaway 100      
Columbia Generating Station 65   HOLDING PER LOAD DISPATCHER REQUEST    
Comanche Peak 1 100      
Comanche Peak 2 100      
Cooper 0 05/29/2018 FORCED OUTAGE TO REPAIR OOS DRYWELL FANS    
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 0 04/06/2018 REFUELING OUTAGE    
Palo Verde 1 100      
Palo Verde 2 100      
Palo Verde 3 100      
River Bend 1 67   REDUCED POWER FOR POWER SUPPRESSION TESTING *  
South Texas 1 100      
South Texas 2 100      
Waterford 3 100      
Wolf Creek 1 100      

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021