Power Reactor Status Report for October 7, 2017

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION    
Peach Bottom 3 83   COASTDOWN TO REFUELING OUTAGE *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 96   INCREASING POWER *  
Susquehanna 2 100        
Three Mile Island 1 0 09/18/2017 EXITING REFUELING OUTAGE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 65   PLANNED MAINTENANCE ON WATER BOX TUBES *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 09/23/2017 REFUELING OUTAGE - CORE RELOAD COMPLETE *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 09/09/2017 REFUELING OUTAGE    
Oconee 1 100        
Oconee 2 97   COASTDOWN TO REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 10/01/2017 MAINTENANCE OUTAGE    
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 0 10/03/2017 REFUELING OUTAGE *  
Vogtle 1 100        
Vogtle 2 100     *  
Watts Bar 1 100        
Watts Bar 2 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 0 10/01/2017 REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS *  
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/12/2017 REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 86   COASTDOWN TO REFUELING OUTAGE *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
LaSalle 1 100        
LaSalle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 0 10/06/2017 REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS - 358 kV LINE #111 AND 345 kV LINE #6832 OOS *  
Point Beach 2 100   358 kV LINE #111 AND 345 kV LINE #6832 OOS    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 10/06/2017 REFUELING OUTAGE - BORATION IN PROGRESS PRIOR TO COMMENCING RCS COOLDOWN *  
Columbia Generating Station 100        
Comanche Peak 1 93   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Grand Gulf 1 55   ROD PATTERN ADJUSTMENT IN PROGRESS - WILL INCREASE POWER TO 100% *  
Palo Verde 1 0 10/06/2017 REFUELING OUTAGE - WILL COMMENCE RCS COOLDOWN IN APPROXIMATELY 90 MINUTES AFTER COMPLETING SOAK *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 64   REDUCED POWER FOR ROD SEQUENCE EXCHANGE *  
South Texas 1 90   REDUCED POWER FOR MAIN STEAM THROTTLE AND GOVERNOR STOP VALVE TESTING *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021