The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for January 10, 2017

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 55   COASTDOWN TO REFUELING OUTAGE    
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100   138KV FEEDER 96952 OUT OF SERVICE *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 93   COASTDOWN TO REFUELING OUTAGE *  
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   LIMITED TO 25 MVAR DUE TO TURBINE VIBRATION CONCERNS    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 91   COASTDOWN TO REFUELING OUTAGE    
Browns Ferry 3 100        
Brunswick 1 100   PART TIME LOAD SHED DUE TO COLD WEATHER *  
Brunswick 2 96   COASTDOWN TO REFUELING OUTAGE - PART TIME LOAD SHED DUE TO COLD WEATHER *  
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100     *  
Hatch 1 100     *  
Hatch 2 96   COASTDOWN TO REFUELING OUTAGE *  
McGuire 1 100     *  
McGuire 2 100     *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 100     *  
Oconee 2 100     *  
Oconee 3 100     *  
Robinson 2 100     *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 13   COMING OFFLINE BUT WILL REMAIN CRITICAL FOR MAIN FEED REG VALVE WORK *  
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 89   HOLDING FOR CHEMISTRY    
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 94   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
LaSalle 1 100        
LaSalle 2 100        
Monticello 100        
Palisades 100        
Perry 1 95   COASTDOWN TO REFUELING OUTAGE *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 89   INCREASING POWER *  
Callaway 90   REDUCED POWER DUE TO CONDENSATE PUMP MOTOR FAILURE    
Columbia Generating Station 90   INVESTIGATING SINGLE CHANNEL TRIP OF RECIRC DRIVE COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Grand Gulf 1 0 09/08/2016 FORCED OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 85   DOWNPOWER DUE TO FEED PUMP SEAL LEAKAGE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021