Power Reactor Status Report for November 11, 2013
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 48 | CONDENSATE PUMP MOTOR REPLACEMENT | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 56 | REDUCING POWER TO 50% TO INVESTIGATE TUBE LEAK | * | ||
Ginna | 100 | ||||
Hope Creek 1 | 36 | HOLDING POWER PENDING RESOLUTION OF RECIRC PUMP CONTROLLER ISSUE | * | ||
Indian Point 2 | 100 | 13.8 KV LINE 33332LM OOS | |||
Indian Point 3 | 100 | 13.8 KV LINE 33332LM OOS | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 0 | 11/09/2013 | FORCED OUTAGE - RX TRIP DUE TO LOSS OF CONDENSER VACUUM - SEE EN #49525 - RESTART ANTICIPATED WITHIN THE NEXT 24 HOURS | * | |
Millstone 3 | 93 | HEATER DRAIN PUMP MAINTENANCE COMPLETED - WILL INCREASE POWER SHORTLY | * | ||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | 345 KV LINE 342 OUT OF SERVICE | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ONE CONTINGENCY AWAY FROM DOWN POWER TO 800MW DUE TO LINE OUTAGE | |||
Susquehanna 1 | 59 | MAINTAINING POWER <60% DUE TO TEMPERATURE LIMITATIONS RELATED TO THE TURBINE BUILDING CHILLERS - HIGH SYSTEM VOLTAGE ACTION IN EFFECT | * | ||
Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION IN EFFECT | * | ||
Three Mile Island 1 | 0 | 10/27/2013 | REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION IN EFFECT | * | |
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | * | |||
Catawba 2 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 0 | 11/08/2013 | REFUELING OUTAGE - RCS DEPRESSURIZED | * | |
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 98 | FORMER 100% NOW 98% BECAUSE OF POWER UPRATE | |||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 20 | REDUCED POWER TO INVESTIGATE RCS LEAKAGE | * | ||
Oconee 2 | 0 | 10/11/2013 | REFUELING OUTAGE | ||
Oconee 3 | 100 | ||||
Robinson 2 | 91 | HOLDING POWER FOR REQUIRED SURVEILLANCIES | * | ||
Saint Lucie 1 | 54 | INCREASING POWER TO 100% | * | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 0 | 10/14/2013 | REFUELING OUTAGE | * | |
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 0 | 10/19/2013 | CORE RELOADED | ||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 0 | 10/01/2013 | REFUELING OUTAGE | ||
Davis-Besse | 100 | ||||
Dresden 2 | 0 | 11/10/2013 | REFUELING OUTAGE | * | |
Dresden 3 | 100 | ||||
Duane Arnold | 98 | REDUCED POWER PER LOAD DISPATCHER INSTRUCTIONS | |||
Fermi 2 | 100 | * | |||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 09/21/2013 | REFUELING OUTAGE | ||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 90 | REDUCED POWER FOR ROD PATTERN ADJUSTMENT | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | MAINTENANCE OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 10/04/2013 | REFUELING OUTAGE | ||
River Bend 1 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021