Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 94 | COASTDOWN TO REFUELING OUTAGE | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | * | |||
Calvert Cliffs 2 | 100 | * | |||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | 13.8 KV LINE 33332LM OOS | |||
Indian Point 3 | 100 | 13.8 KV LINE 33332LM OOS | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 0 | 09/08/2013 | DEFUELED | ||
Pilgrim 1 | 100 | 345 KV OFFSITE LINE WORK | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
Vermont Yankee | 100 | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 0 | 09/13/2013 | DEFUELED | ||
Farley 1 | 84 | COASTDOWN TO REFUELING OUTAGE | * | ||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 98 | INCREASING POWER TO 100% | * | ||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 0 | 09/07/2013 | REFUELING OUTAGE - CORE RELOADED | * | |
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 0 | 09/13/2013 | REFUELING OUTAGE | ||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 84 | COASTDOWN TO REFUELING OUTAGE | * | ||
Sequoyah 2 | 100 | GRID RISK IS YELLOW - PLANNED MAINTENANCE ON ONE 500 kV LINE | |||
Summer | 93 | INCREASING POWER TO 100% | * | ||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 0 | 09/08/2013 | REFUELING OUTAGE | ||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 96 | COASTDOWN TO REFUELING OUTAGE | * | ||
D.C. Cook 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
D.C. Cook 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
Davis-Besse | 100 | HIGH SYSTEM VOLTAGE ALERT | |||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 98 | FUEL CONDITIONING HOLD | * | ||
La Salle 1 | 100 | ||||
La Salle 2 | 62 | POWER SUPPRESSION TESTING | * | ||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | HIGH VOLTAGE ACTION | |||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 09/21/2013 | REFUELING OUTAGE | ||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 70 | HEATER DRAIN PUMP MAINTENANCE | * | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | * | |||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE - FUEL LOADING COMPLETE | ||
Grand Gulf 1 | 72 | DECREASING POWER FOR ROD SEQUENCE EXCHANGE | * | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
South Texas 1 | 87 | FEEDWATER HEATER/CONDENSER BELLOWS ISSUE | |||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 09/11/2013 | FORCED OUTAGE | * |