Power Reactor Status Report for September 15, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 98   COASTDOWN TO REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT *  
Beaver Valley 2 100   HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT    
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT    
FitzPatrick 100     *  
Ginna 100        
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT *  
Indian Point 2 100   13.8 KV LINE 33332LM OOS    
Indian Point 3 100   13.8 KV LINE 33332LM OOS    
Limerick 1 92   REDUCED POWER FOR PLANT TESTING *  
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 0 09/08/2013 REFUELING OUTAGE    
Pilgrim 1 1   COMMENCE STARTUP *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 0 09/13/2013 REACTOR SCRAM. SEE EN #49342 HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT    
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100     *  
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 99   CROSS TYING AUX STEAM HEADERS    
Catawba 2 0 09/13/2013 ENTERING REFUELING OUTAGE *  
Farley 1 96   COASTDOWN TO REFUELING OUTAGE *  
Farley 2 100        
Harris 1 7   REDUCE POWER FOR TURBINE HIGH VIBRATION TROUBLESHOOTING *  
Hatch 1 100     *  
Hatch 2 38   SHUTDOWN DUE TO MSIV ISSUE *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 09/07/2013 REFUELING OUTAGE    
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 09/13/2013 ENTERING REFUELING OUTAGE *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 94   END OF CYCLE COASTDOWN *  
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 09/08/2013 REFUELING OUTAGE    
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   COASTDOWN TO REFUELING OUTAGE    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100   HIGH SYSTEM VOLTAGE; MINIMUM GENERATION ALERT *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 09/08/2013 MAINTENANCE OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 70   INCREASING POWER AT 3% PER HOUR *  
Prairie Island 2 80   REDUCED POWER FOR GENERATOR VIBRATION ISSUE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE - FUEL LOADING COMPLETE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 87   FEEDWATER HEATER/CONDENSER BELLOWS ISSUE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 09/11/2013 TECH SPEC REQUIRED SHUTDOWN. SEE EN #49339    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021